27
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND
OPERATION
BRINE POSITION
Hard water enters unit at valve inlet — flows up into injector housing and down thru nozzle and orifice to draw brine
from the brine tank — brine flows down thru mineral and enters the center tube thru bottom distributor — flows up thru
center tube — around the piston and out thru the drain line.
OUTLET
BRINE VALVE
FLOW CONTROL
INLET
BRINE
TANK
BRINE
LEVEL
RESIN
TANK
Содержание MGT 60M
Страница 5: ...MGT 2 60M 600M NXT2 SYSTEM 14 DEMAND SYSTEM INFORMATION 2 5 232 ...
Страница 7: ...MGT 2 60M 600M NXT2 SYSTEM 14 DEMAND SYSTEM INFORMATION 4 5 232 ...
Страница 56: ...8 635 ...