30
MGT 2” 60M–600M NXT2 SYSTEM 14 DEMAND
OPERATION
BRINE TANK FILL POSITION
Hard water flows thru the service valve and down thru the mineral. Conditioned water enters the bottom distributor —
flows up the center tube around the piston to the outlet. Hard water flows to the regenerating valve thru the injector
housing and brine valve to fill the brine tank.
FLOW CONTROL
INLET
OUTLET
DRAIN
BRINE VALVE
BRINE
LEVEL
RESIN
TANK
INLET
BRINE
TANK
Содержание MGT 60M
Страница 5: ...MGT 2 60M 600M NXT2 SYSTEM 14 DEMAND SYSTEM INFORMATION 2 5 232 ...
Страница 7: ...MGT 2 60M 600M NXT2 SYSTEM 14 DEMAND SYSTEM INFORMATION 4 5 232 ...
Страница 56: ...8 635 ...