6
Tower Installation
These installation instructions are intended to help you prepare
before your tower arrives. If discrepancies exist between these
instructions and those shipped with the tower, the instructions
shipped with the tower will govern.
1. Prior to placement of the tower, confirm that the supporting platform is
level, and that the anchor bolt holes are correctly located in accordance
with Marley drawings.
2. Place bottom module on your prepared supports, aligning anchor bolt
holes with those in your supporting steel. Make sure that the orientation
agrees with your intended piping arrangement. Attach tower to supporting
steel with four 5⁄8" diameter bolts and flat washers (by others). Position
flat washers between the bolt head and the tower bottom flange.
3. Before setting top module in place on bottom module, clean any debris
from the top of the bottom module. Ensure that the fill surface is free from
debris and all fill packs are level. Recommended tie-down instructions are
provided to the truck driver upon tower pickup. If damage occurs to the
tower due to tie-down procedures other than those recommended in the
drawing, it should be noted upon arrival. Remove the protective paper off
the sealing gasket tape before setting the top module and ensure there is
coverage around the entire perimeter. Place the top module on the bottom
module, aligning mating holes as it is set in place. Make sure that the ori-
entation of the top module agrees with your intended piping arrangement.
Sections are 180° reversible with respect to each other. Pay close attention
to face designations on sales orientation drawings e.g. Face A, Face B,
etc. Use drift pins to align bolt holes during the assembly of the top and
bottom modules as the top is lowered into place. Use care when setting
the modules as lifting and resetting the top module will compromise the
sealing gasket between the two sections, possibly resulting in a leaking
joint. If the top module must be reset, it may be necessary to remove the
sealing gasket tape and replace.
Gasket details must be followed correctly or leaks may occur that
will not be covered under warranty.
4. Attach top module to bottom module with fasteners provided—according
to “MD Field Installation Manual”.
Note
Note
installation