CONFIDENTAL. DO NOT DUPLICATE OR REDISTRIBUTE
10
Pre-Install Guide_2.0.0 | September 11, 2018
PRE-INSTALLATION GUIDE : METAL X SYSTEM
WASH-1
6. Remove the plastic covering from the Wash-1 unit.
7. Using safe lifting technique, remove the Wash-1 from
its crate and onto the floor.
Note:
Be mindful of the water drain, which protrudes 4”
from the rear face of the unit. There is also a bolt protruding
1” from the bottom of the Wash-1; be aware of it when
sliding the unit forward out of the crate. Removing the
Wash-1 from its crate should take 2-3 people.
8. Roll the Wash-1 to its final operating location with
screen facing outward and water drain in rear, near
its facility exhaust connection. Use an elevator when
moving between floors.
9. Engage the wheel locks when the Wash-1 is in its
operating location, or when leaving it unattended.
10. Remove the accessories and documentation from
inside the unit and set aside for the Installer.
Store the Wash-1 packing crate and materials.
CONNECT WASH-1 TO FACILITY EXHAUST
Note: Ensure that all documentation is removed from
inside the unit before connecting exhaust. Failure to
do so may result in documentation being ingested into
your facility exhaust.
1. Connect your facility exhaust to the 4” round duct on the
rear of the Wash-1 station and secure the connection
appropriately.