98
EN
Remove cutting rods
• Remove all check pins
Access to part 4 of the instruction
Part 3B – Mounting of the circular base
Create the lower frame of the pool
Gradually connect the arcuate rails [3] with the connecting pins [2] and place them
around the perimeter of the pool (see Fig. 3-1).
NOTE: The supplied connecting spindles [2] are in two versions - the spikes without
longitudinal cutting are designed for the lower frame, with a longitudinal section
(flexible) for the upper frame.
Bind the strips as far as possible, leave the last bar uncovered, because adjusting
the length of the bar will be necessary after the pool is placed.
Make sure that the lower frame is actually a circle by measuring the distance from
the center pin.
Discover fine piece
Apply a layer of not more than 2 cm of fine sand, preferably stucco, for easy
alignment of minor terrain unevenness (see Figure 3-2) over the entire pool base
area (excluding the outer 30 cm circle). Do not put sand near the lower rails, it could
get into the groove of the rails and then disable the wall. Leave about 15 cm wide
strip around the lower rails
without sand. Align the surface with the rakes so that the layer is flat and smooth.
NOTE: A stronger layer of sand may adversely affect the stability of the pool in the
future.
Spread about 0.2 - 0.3 m
3
of sifted sand to the pool area according to the pool size.
You will need it to create a filler fill (see the "Create fillet" chapter).
NOTE: When handling sand, be careful not to damage the bottom frame or sanding
it.
Part 4 – Mounting the wall and foil wall
Read the wall of the swimming pool
• Wait for a quiet sunny day. Do not try to build the pool wall behind the wind.
Ensure the assistance of at least one adult.
• Unpack the curved wall of the pool and place it in the center of the pool on a pie-
ce of plywood (Figure 4-1). The overhead holes for the dirt collector must be at
the top of the wall.
• Unpack and divide the longitudinally cut tubes [14] according to point 2 - Oval
Pool Upper Tube Identification.
IMPORTANT: Make sure to find out where the openings for the dirt collector are
located before unfurling the wall. If they are at the beginning of the wall, as shown
in Figure 4-2, everything is fine and you can unfold the wall as shown. If this is not
the case, the wall has been rolled in the opposite direction. In that case, unfold the
wall in the opposite direction to that shown in Figure 4-2, in the clockwise direction.
Содержание Orlando Premium 10310019
Страница 1: ...Baz n Orlando Premium N vod k mont i Ov l 3 66 5 48m Kruh 4 60m Kruh 5 48m CZ SK DE PL EN HU...
Страница 22: ...22 Kontakty www marimex cz Z kaznick centrum tel 261 222 111 e mail info marimex cz CZ...
Страница 43: ...43 Kontakty www marimex sk Z kazn cke centrum tel 421 233 004 194 e mail info marimex sk SK...
Страница 66: ...66 Kontaktinformationen www marimex cz Kundencenter tel 261 222 111 e mail zakaznickecentrum marimex cz DE...
Страница 87: ...87 Kontakt www marimex cz Centrum obs ugi klienta tel 261 222 111 e mail zakaznickecentrum marimex cz PL...
Страница 108: ...108 EN Contact www marimex cz Custome Centre tel 261 222 111 e mail zakaznickecentrum marimex cz...
Страница 129: ...129 rintkez s www marimex cz gyf lk zpont tel 261 222 111 e mail zakaznickecentrum marimex cz HU...
Страница 131: ...131 2A 1 2A 3 2A 5 2A 7 2A 2 2A 4 2A 6 2A 8...
Страница 132: ...132 2A 9 2A 11 2A 13 2B 2 2A 10 2A 12 2B 1 2B 3...
Страница 133: ...133 2B 4 2B 6 2B 8 3 2 2B 5 2B 7 3 1...
Страница 134: ...134 3 3 3A 2 3A 4 3A 6 3A 1 3A 3 3A 5 3A 7...
Страница 135: ...135 3A 8 3A 10 3A 12 3A 14 3A 9 3A 11 3A 13 3A 15...
Страница 136: ...136 3A 16 3A 18 3A 20 3A 22 3A 17 3A 19 3A 21 3A 23...
Страница 137: ...137 3A 24 4 1 4 5 4 7 3A 25 4 2 4 6 4 8...
Страница 138: ...138 4 9 4 11 4 13 4 15 4 10 4 12 4 14 4 16...
Страница 139: ...139 4 18 4 20 5 1 5 3 4 19 4 131 5 2 5 4...
Страница 140: ...140 5 5 5 7 5 6 5 8...
Страница 141: ...141 6 1 6 2...
Страница 144: ...25 let MARIMEX 1993 2018...