Fire damper - FDMQ

Page 64

Version 2023-07-27

TPM 103/14

Installation frame E3

Installation frame E2 is designed for installation into:

Gypsum wall construction

The damper is equipped with an intumescent sealing on the casing. This sealing fills the gap between the damper casing
and frame in the event of a fire. The frame is equipped with an intumescent sealing on external side. This sealing fills the
gap between the frame and construction in the event of a fire

 Gypsum wall th. 100 mm

 Material:

Installation frame - cement-lime boards and galvanized steel

Fasteners - galvanized steel

Installation frame E3

100

110

A+112

A+102

B

+

1

1

2

B

+

1

0

2

Содержание FDMQ

Страница 1: ...Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mandik mandik cz FDMQ Fire damper Technical Documentation Installation Commissioning Operation Maintenance and Service Manual TPM...

Страница 2: ...46 Shaft walls 47 In solid ceiling construction 50 Outside solid ceiling construction 54 Installation frames 56 Installation frame E1 57 Installation frame E2 61 Installation frame E3 64 Installation...

Страница 3: ...nual control or by melting a thermal fuse The return spring of the actuator is actuated when a thermoelectric activation device BAT is activated when a test button on BAT is pressed or when power supp...

Страница 4: ...Design 01 ATTENTION Manual controls are produced in five sizes M1 to M5 difference is only in size of a closing spring which closes the fire damper For the size of fire dampers is always assigned the...

Страница 5: ...f protection IP 67 Working temperature 25 C 120 C Limit switch G905 300E03W1 This limit switch is possible to connect in two following ways CUT OFF if the arm is moving connect wire 1 2 SWITCH ON if t...

Страница 6: ...ition CLOSED The time of closing the damper blade from the position OPEN to the position CLOSED takes maximum 20 sec In case that the power supply is restored again the blade can be in any position th...

Страница 7: ...5 ms Protection class II III Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position wil...

Страница 8: ...Degree of protection IP 54 Running time motor spring return 60 s 20 s Ambient temperature normal duty safety duty non operating temperature 30 C 55 C The safe position will be attained up to max 75 C...

Страница 9: ...ection IP 54 Running time motor spring return 120 s 16 s Ambient temperature normal duty safety duty non operating temperature 30 C 50 C The safe position will be attained up to max 75 C 40 C 50 C Con...

Страница 10: ...ion device BAT If the thermal fuse Tf1 is interrupted due to temperature outside the duct it is necessary to replace the spring return actuator Thermoelectric activation device BAT is integral part of...

Страница 11: ...oswitches Design 41 with actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K and with supply device BKN 230 24 MOD voltage AC 230 V 1 2 3 4 5 6 7 1 2 S2 S1 S3 S5 S4 S6 2 3 4 5 6 1 BAT Tf Tf L...

Страница 12: ...or is supposed to be controlled without any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED on BKN 230 24 is on when voltage is present in...

Страница 13: ...MP by means of terminals 6 and 7 If the actuator is supposed to be controlled without any signal from the central it can be switched on by means of a bridge between the terminals 3 and 4 A green LED o...

Страница 14: ...connected the damper blade position will be FAILURE For design 63S the smoke detector is activated when smoke spreads in air duct system Deactivation of the smoke detector alarm status is provided by...

Страница 15: ...th an external smoke detector Design 62 Communication and supply device BKN 230 24MP Nominal voltage AC 230 V 50 60Hz Power consumption 8 W including actuator Dimensioning 10 VA including actuator Pro...

Страница 16: ...the safety relay opens and stays in this state even if the smoke disappears from the scanning chamber The sensor remains in the alarm state until the power supply is briefly reset On the pin 3 an exte...

Страница 17: ...trol and checks of fire dampers with the BF 24 TN ST BFL 24 T ST BFN 24 T ST actuator in conjunction with the BKN 230 24 supply and communication device BKS 24 1B receives information about the situat...

Страница 18: ...of the connected fire dampers It is possible to signalise functions such as the damper position and failure reports or to transmit them further to the system by means of integrated auxiliary switches...

Страница 19: ...rol 130 93 24 123 260 375 30 A B 30 35 A 10 35 B 10 80 X 72 mm BFL X 76 mm BFN X 83 mm BF X III DIMENSIONS 1 Damper casing 2 Manual control 3 Damper blade 4 Inspection opening cover 5 Sensor sticker 6...

Страница 20: ...value a or c These values are specified in chapter Technical parameters see pages 21 to 26 Values a and c has to be respected when projecting following air conditioning duct Flange of a damper CONTROL...

Страница 21: ...00 43 5 258 5 21 22 5 0 1270 315 66 12 13 5 0 0388 710 48 5 263 5 21 22 5 0 1290 355 86 13 14 5 0 0450 750 68 5 283 5 22 23 5 0 1370 400 108 5 14 15 5 0 0519 800 93 5 308 5 23 24 5 0 1470 450 133 5 15...

Страница 22: ...355 86 15 5 17 5 0 0798 800 93 5 308 5 29 32 0 2426 BF 400 108 5 17 18 5 0 0921 400 x 150 12 6 12 7 0 0319 BFL M1 450 133 5 18 21 0 1059 180 13 5 15 5 0 0431 500 158 5 19 5 22 5 0 1196 M2 200 8 5 14...

Страница 23: ...0 0661 500 158 5 25 5 28 5 0 2066 200 8 5 18 20 5 0 0776 550 183 5 27 30 0 2304 BFN 225 21 18 5 21 5 0 0920 560 188 5 27 30 0 2351 250 33 5 19 22 0 1064 600 208 5 28 5 31 5 0 2541 280 48 5 20 23 0 123...

Страница 24: ...25 5 0 1341 600 208 5 36 39 0 3344 280 48 5 24 27 0 1559 M2 630 8 5 223 5 37 40 0 3531 300 59 24 5 27 5 0 1704 650 18 5 233 5 38 41 0 3656 315 66 25 28 0 1813 700 43 5 258 5 40 43 0 3969 355 86 26 5...

Страница 25: ...0 0 5556 450 133 5 49 52 0 4716 BF M3 710 48 5 263 5 47 50 0 5644 500 158 5 47 5 50 5 0 5329 750 68 5 283 5 49 52 0 5994 550 183 5 50 5 53 5 0 5941 800 93 5 308 5 51 5 54 5 0 6431 M4 560 188 5 51 5 54...

Страница 26: ...991 550 183 5 58 5 61 5 0 7154 225 21 39 5 41 0 2360 560 188 5 59 5 62 5 0 7301 250 33 5 41 5 43 0 2729 BFN 600 208 5 62 5 65 5 0 7891 M4 280 48 5 44 45 5 0 3171 630 8 5 223 5 64 67 0 8334 M5 300 59 4...

Страница 27: ...in the damper blade should not grind against the damper casing during opening or closing The distance between the fire damper and the construc tion wall ceiling must be 75 mm at the minimum according...

Страница 28: ...g to EN 1366 2 Outside the wall ceiling contruction The duct and damper must be protected by fire insulation If the damper is installed outside the fire separation construction a damper side A 800 mm...

Страница 29: ...90 ve i o S 45 In sandwich wall construction 100 Weichschott system with fire resistant boards EI 90 ve i o S 46 In shaft wall Rigips 110 Mortar or gypsum EI 90 ve i o S 48 80 Installation frame E1 49...

Страница 30: ...tion 1 FDMQ 2 Solid wall construction 3 Mortar or gypsum 4 Profile with threaded rod see pages 76 to 79 5 Duct In solid wall construction mortar or gypsum EIS 90 X X 100 50 150 50 150 100 B min B 100...

Страница 31: ...f mineral wool min density 66 kg m e g ISOVER Ultimate Protect SLAB 4 th 60 mm In solid wall construction 2 dampers in battery mortar or gypsum EIS 90 X Y 50 150 50 150 Y 100 B min B 100 max B 300 2xA...

Страница 32: ...66 3 1 FDMQ 2 Solid wall construction 3 Duct 4 Profile with threaded rod see pages 76 to 79 5 Protective cladding board min th 30 mm min density 750 kg m3 e g PROMATECT MST see page 89 Weichschott sys...

Страница 33: ...OCKWOOL HARDROCK STEPROCK HD 4 Fire resistant coating th 1 mm e g PROMASTOP I 5 Fire resistant board min th 15 mm min density 870 kg m3 e g PROMATECT H 6 Screw 4x50 mm screws must be fixed in the wall...

Страница 34: ...e wall ceiling mortar or gypsum mineral wool For connection of following duct see page 80 Conditions of this installation are also valid for the installation in Solid ceiling construction Penetration...

Страница 35: ...acturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both sides of damper acc to national rules Duct between fire damper and fire separating constr...

Страница 36: ...all and fire damper is unlimited When installing the insulation follow the ISOVER manufacturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both si...

Страница 37: ...ineral wool with fire resistant coating and fire resistant board For connection of following duct see page 80 Minimum and maximum distance between the wall and fire damper is unlimited When installing...

Страница 38: ...x B 300 A min A 100 max A 300 100 X 50 150 100 In gypsum wall construction 1 FDMQ 2 Gypsum wall construction 3 Mortar or gypsum 4 Profile with threaded rod see pages 76 to 79 5 Duct In gypsum wall con...

Страница 39: ...ypsum wall construction 3 Mortar or gypsum 4 Profile with threaded rod see pages 76 to 79 5 Duct 6 U profile type 3 7 U profile type 1 8 Screw TEX 4 8x18 mm pitch 200 mm 9 Sealing 10 Insulation board...

Страница 40: ...66 3 1 FDMQ 2 Gypsum wall construction 3 Duct 4 Profile with threaded rod see pages 76 to 79 5 Protective cladding board min th 30 mm min density 750 kg m3 e g PROMATECT MST see page 89 Weichschott sy...

Страница 41: ...FDMQ 2 Gypsum wall construction 3 Mineral wool board min density 140 kg m3 e g PROMAPYR T150 ROCKWOOL HARDROCK STEPROCK HD 4 Fire resistant coating th 1 mm e g PROMASTOP I 5 Fire resistant board min...

Страница 42: ...ROCKWOOL HARDROCK STEPROCK HD 6 Duct In gypsum wall construction installation next to the wall ceiling mortar or gypsum mineral wool For connection of following duct see page 80 Conditions of this in...

Страница 43: ...amper is unlimited When installing the insulation follow the ISOVER manufacturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both sides of damper...

Страница 44: ...all and fire damper is unlimited When installing the insulation follow the ISOVER manufacturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both si...

Страница 45: ...mineral wool with fire resistant coating and fire resistant board For connection of following duct see page 80 Minimum and maximum distance between the wall and fire damper is unlimited When installin...

Страница 46: ...B W 3 Fire resistant board min th 15 mm min density 870 kg m3 e g PROMATECT H 4 Fixing connection of boards threaded rod M8 length of the threaded rod for 100 mm sandwich construction is approx 150 mm...

Страница 47: ...boards are mounted to tight butt joints without need of cementing The second sheathing layer is screwed to the first sheathing layer using screws Rodurit in square net 250 mm Reset of joints of the fi...

Страница 48: ...ional fire resistant board tl 20 mm Rigips Glasroc F Ridurit 7 Profile with threaded rod see pages 76 to 79 8 Duct EIS 90 X 50 150 min A 100 max A 300 250 50 250 50 100 100 X 50 150 110 50 20 20 20 50...

Страница 49: ...uct see page 80 Follow shaft wall manufacturer s instructions All technical specifications and conditions can be found at www rigips cz Installation frame can be installed on the damper or delivered s...

Страница 50: ...4 Profile with threaded rod see pages 76 to 79 5 Duct In solid ceiling construction In solid ceiling construction mortar or gypsum X X 50 150 A A min A 100 max A 300 A B min B 100 max B 300 EIS 90 50...

Страница 51: ...one opening mortar or gypsum For connection of following duct see page 80 The gap between the damper and construction is filled with mortar or gypsum min 110 mm Concrete min 125 mm Aerated concrete 1...

Страница 52: ...ded rod see pages 76 to 79 5 Protective cladding board min th 30 mm min density 750 kg m3 e g PROMATECT MST see page 89 Weichschott system HILTI 6 Mineral wool board min density 140 kg m HILTI CFS CT...

Страница 53: ...following duct see page 80 min 110 mm Concrete min 125 mm Aerated concrete 1 FDMQ 2 Solid ceiling construction 3 Mineral wool board min density 140 kg m3 e g PROMAPYR T150 ROCKWOOL HARDROCK STEPROCK H...

Страница 54: ...ire damper is unlimited When installing the insulation follow the ROCKWOOL manufacturer s instructions The damper and the duct must be suspended separately The duct must be suspended on both sides of...

Страница 55: ...connection of following duct see page 80 The duct must be suspended or supported on both sides of the damper acc to national rules Load of the suspension system depends on weight of the fire damper a...

Страница 56: ...l construction Gypsum wall construction Solid ceiling construction In construction Outside construction On construction In construction Outside construction On construction In construction Outside con...

Страница 57: ...n Solid ceiling construction Installation frame is equipped with an intumescent sealing on the inside and outside This sealing fills the gap between the damper casing and frame and between the frame a...

Страница 58: ...tion frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84 5 Duct 6 Profile with threaded rod see pages 76 to 79 7 Solid wall construction A B 109 3 installation ope...

Страница 59: ...lled on the damper or delivered separately Gypsum wall construction installation frame E1 1 FDMQ 2 Installation frame 3 Bracket with fasteners delivered with frame 4 Fill the gaps with glue PROMAT K84...

Страница 60: ...0 A 1500 8 Number of brackets X ZA ZB Number of screws Y 2 x X For connection of following duct see page 80 Installation frame can be installed on the damper or delivered separately Solid ceiling cons...

Страница 61: ...olid wall construction Solid ceiling construction The damper is equipped with an intumescent sealing on the casing This sealing fills the gap between the steel insert and the damper in the event of a...

Страница 62: ...alled on the damper or delivered separately In solid wall construction installation frame E2 100 1 FDMQ 2 Installation frame 3 Mounting of the damper to the frame delivered with frame 4 Duct 5 Profile...

Страница 63: ...rete For connection of following duct see page 80 Installation frame can be installed on the damper or delivered separately In solid ceiling construction installation frame E2 1 FDMQ 2 Installation fr...

Страница 64: ...casing This sealing fills the gap between the damper casing and frame in the event of a fire The frame is equipped with an intumescent sealing on external side This sealing fills the gap between the f...

Страница 65: ...to 79 8 Gypsum wall construction A B 107 3 installation opening A A 107 3 installation opening A 112 B B 107 3 installation opening B 112 100 X X Side A Number of brackets ZA Side B Number of brackets...

Страница 66: ...n Solid ceiling construction Outside solid ceiling construction with concreting Installation frame is equipped with an intumescent sealing on the inside This sealing fills the gap between the damper c...

Страница 67: ...hreaded rod see pages 76 to 79 5 Solid wall construction 6 Holes for fixing the frame with threaded rods or steel anchors material for fixing the frame is not included For connection of following duct...

Страница 68: ...separately In solid ceiling construction installation frame E4 min 110 mm Concrete min 125 mm Aerated concrete 1 FDMQ 2 Installation frame apply HILTI CFS S ACR mastic at the entire area and glue it...

Страница 69: ...B 300 min 110 mm Concrete min 125 mm Aerated concrete For connection of following duct see page 80 The duct must be suspended or supported on both sides of the damper acc to national rules Load of th...

Страница 70: ...o 150 mm Installation frame is equipped with an intumescent sealing on the inside and outside This sealing fills the gap between the damper casing and frame and between the frame and construction in t...

Страница 71: ...of the wall system manufacturer Ceiling UW Profile CW Profile 625 2x Screw Connection of the flexible ceiling according to wall specifications X UW profile screwed to the con nection of the flexible c...

Страница 72: ...20 Y X UW profile screwed to the con nection of the flexible ceiling Cement lime boards filling min density 450 kg m Closed sides of profile Apply intumescent sealant between the ceiling and boards e...

Страница 73: ...stallation outside solid wall ceiling construction with insulation from fire resistant boards Installation frame is equipped with an intumescent sealing on the inside This sealing fills the gap betwee...

Страница 74: ...or supported so that all load transfer from the following duct to the fire damper is absolutely excluded Adjacent duct must be suspended or supported as required by the duct suppliers Installation fr...

Страница 75: ...et metal min thickness 0 8 mm 7 Clamp with threaded rod see pages 76 to 79 8 Solid ceiling construction 9 Mortar or gypsum EIS 90 For connection of following duct see page 80 Minimum and maximum dista...

Страница 76: ...6 192 M18 192 117 234 M20 245 150 300 Without anchor With anchor Examples of anchoring to the ceiling construction Follow the instructions of fixing specialist or installation company With hinge plate...

Страница 77: ...mension elements of the suspension system acc to the weight of the damper see page 76 Placing of mounting brackets 1 FDMB 2 Threaded rod M8 M20 3 Support HILTI MQ 41 or MQ 41 3 or equivalent 4 Bored p...

Страница 78: ...ess 2 mm and min width 60 mm 8 Nut M8 with anchor 9 Hexagon head screw 10 Installation holes 11 Screw assembly M6 screw M6x10 nut M6 12 Gypsum grid from U profile Example of fixing FDMQ to the wall ce...

Страница 79: ...a s or sheet metal min thickness 2 mm and min width 60 mm 7 Nut M8 with anchor 8 Installation holes 9 Screw assembly M6 screw M6x10 nut M6 Example of fixing FDMQ to the ceiling In solid ceiling constr...

Страница 80: ...tive X Electrically conductive connection 1 FDMQ 2 Duct 3 Extension piece if required 4 Damping pad 5 Steel clamp min screw M8 6 Screw assembly M8 screw M8x20 mm 2 pcs toothed lock washer M8 nut M8 7...

Страница 81: ...ATA Pressure loss Pressure loss calculation Determination of pressure loss by using diagram 1 2 kg m3 p w2 2 p Pa presure loss w m s air flow speed in nominal damper section kg m3 air density coeffici...

Страница 82: ...0 212 750 0 344 0 320 0 312 0 300 0 278 0 263 0 252 0 239 0 231 0 223 0 216 0 213 0 209 800 0 335 0 311 0 301 0 289 0 274 0 257 0 244 0 233 0 223 0 215 0 209 0 205 0 203 A B 600 630 650 700 710 750 80...

Страница 83: ...69 3 70 7 71 9 73 73 9 74 7 77 9 80 1 81 8 83 2 85 5 87 2 90 9 92 6 Tables of acoustitc values Correction to the weight filter A w m s 2 3 4 5 6 7 8 9 10 11 12 KA dB 15 11 8 9 8 8 4 7 3 6 4 5 7 5 4 5...

Страница 84: ...entering the inner space of a damper casing lower sheet of a manual control lock holder 1 lock lever 2 closing spring 8 dia stopper pin manual control pin 5 Inspection opening cover including the sti...

Страница 85: ...irect weather impact there must not occur any shocks and ambient temperature must not exceed 50 C Dampers must be protected against impact when transported and manipulated During transportation the da...

Страница 86: ...nufacturer documentation All works done on the fire dampers must be done according international and local norms and laws All effective safety standards and directives must be obse rved during damper...

Страница 87: ...er 6 Thermal fuse 2 Mouting plate 7 Manual control 3 Sealing cover 8 Spring return actuator 4 Sealing of a mouting plate 9 Thermoelectric activation device BAT 5 Cover of a mouting plate 10 Sensor sti...

Страница 88: ...screw DIN 931 with washer M6 6 4 DIN 7349 4 Repeat the procedure on the other side of the VRM Q and an opposite side A of the fire damper 1 FDMQ 2 VRM Q 3 Part A of VRM Q 4 Part B of VRM Q 5 Hexagon...

Страница 89: ...accessory or can be sourced from local supplier If protective cladding boards are required this must be specified in the ordering key Protective cladding boards are made of PROMATECT MST thickness 30...

Страница 90: ...ally by applying the supply voltage It is recommended to provide periodical checks maintenance and service actions on fire equipment by authorized persons The authorized persons can be trained by prod...

Страница 91: ...ic activation device BAT or by disconnection the power supply from electrical fire signalization Check the rotation of the blade back to OPEN position by restoring the power supply to the actuator e g...

Страница 92: ...tches OPEN CLOSED Zone 1 2 81 With actuator BF 230 TN BFL BFN 230 T voltage AC 230 V 40 With actuator BF 24 TN BFL BFN 24 T with smoke detector ORS 142 K and with supply device BKN 230 24 MOD voltage...

Страница 93: ...Protective cladding boards CLADDING BOARDS FDMQ 800x400 size AxB Data label WEIGHT kg Dob sk 550 267 24 Hostomice Czech Republic MAND K a s DESIGN SERIAL NO DIMENSION TPM XXX XX R CLASSIFICATION MANU...

Страница 94: ...m The producer reserves the right for innovations of the product For actual product information see www mandik com MAND K a s Dob sk 550 267 24 Hostomice Czech Republic Tel 420 311 706 742 E Mail mand...