Page 67
Version 2023-07-27
Fire damper - FDMQ
TPM 103/14
1
FDMQ
2
Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3
Duct
4
Profile with threaded rod
5
Solid wall construction
6
Holes for fixing the frame with threaded rods or steel anchors
(material for fixing the frame is not included)
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
In solid wall construction - installation frame E4
EIS 90
A
(B
)+
5
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
A
A+165
B
B
+
1
6
4
≥
100
4 x
Ø
12
115