Page 49
Version 2023-07-27
Fire damper - FDMQ
TPM 103/14
1
FDMQ
2
Installation frame E1
3
Bracket with fasteners (delivered with frame)
4
Fill the gaps with glue PROMAT K84
5
Fire-resistant board th. 20 mm Rigips Glasroc F Ridurit
6
Screw Rigips Ridurit TX 3,5x35 mm
7
Additional fire-resistant board th. 20 mm Rigips Glasroc F Ridurit
8
Profile with threaded rod
9
Duct
■
For connection of following duct
■
Follow shaft wall manufacturer's instructions
■
All technical specifications and conditions can be found at
■
Installation frame can be installed on the damper or delivered separately
■
X
X
In shaft wall Rigips - installation frame R1
EIS 90
≤
2
5
0
5
0
≤ 250
50
≥
1
0
0
≥
100
20
20
≥
1
0
0
A
A+109
+3
(installation opening)
A+124
B
B
+
1
0
9
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
B
+
1
2
4
80
A
(B
)+
1
0
9
+
3
(i
n
s
ta
lla
ti
o
n
o
p
e
n
in
g
)
20
20
Side A
Number of
brackets
ZA
Side B
Number of
brackets
ZB
A ≤ 500
4
B ≤ 500
0
500 < A ≤ 1000
6
500 < B ≤ 800
4
1000 < A ≤ 1500
8
Number of brackets X = ZA + ZB
Number of screws Y = 2 x X