6
© Mammoth Home Selection
TM
INSTALLATION
DESIGNED FOR METAL DUCTWORK AND PLENUM
STEP 1:
STEP 1:
Make a starting hole and then
use a metal shear to create
two openings
Use a 2-1/4” drill to create
two openings
OR
STEP 3:
Use sheet metal screws
provided
to secure the UV air sanitizer
STEP 2:
Cut hole only in ductwork to
prevent accidental cutting of
wires or refrigerant pipes
PREPARATION
Place the included
label on desired
location
and prepare for
installation.