5
(800) 858-5374 | www.mammothome.com
INSTALLATION
DESIGNED FOR METAL DUCTWORK AND PLENUM
1.
Once the mounting location is identified, apply the Installation Template
sticker to the surface and use template to locate position to cut hole.
2.
Use the drill or metal shear to cut the openings for the UV lamps.
3.
Double check to ensure proper fitment of the unit.
4.
Install the screws to affix the Air Sanitizer as per Photo E.
5.
Plug in the power for the fixture and power on the device.
Airflow
Direction
Airflow
Direction
CAUTION
Do not drill into refrigerant line or fan, etc. After cutting hole avoid
sharp edges.