2. Change of Ball screw ass’y
※
Can be replaced without removing Shear blade ass’y.
※
Put on Leather globe etc.
DISASSEMBLING
1. Remove Ball screw ass’y and Motor from Upper housing.
2
-
1
Slotted screwdriver
2. Remove Stop ring E-4 by twisting
Slotted screwdriver.
Stop ring E-4
2
-
2
3. Remove Link arm (15) by pulling out Flat fillister HD. pin 5 (16).
(16)
(15)
(58)
2
-
3
Board
4.
Remove Board by loo Pan head tapping screw
2x10 (58).
Be careful not to bend Flexible board.
Flexible board
5. Peel off Flexible board carefully
from Bearing box complete.
2
-
4
Bearing box
complete
2
-
5
(27)
There is one more on the other side.
6. Loosen C.H.screw
M3x10 (27).
2
-
6
7. Pull out Motor (33) from
Ball screw ass’y (26).
(26)
(33)
2
-
7
8. Pull out parts below.
Internal gear 48(28)
Spur gear 18 (29)
Flat washer 12 (30)
P 9/
29
Содержание DUP361
Страница 29: ...P29 29 Saved Use history information...