
05_20ed3a Machine Delivery.fm
5 - 1
3UH,QVWDOODWLRQ*XLGH
('*(
5.1
Overview
This chapter describes how to receive, inspect, unload, move to site, level,
clean, and connect piping and electrical power to the machine.
Performance of these duties:
•
Ensures the smoothest and shortest installation time.
•
Provides maximum training time for operator and maintenance person-
nel.
The Installation Process
Makino’s Installation process includes Pre-Installation duties to be performed by you.
These duties are described in this chapter and
.
Makino customers must perform these duties to provide the maximum amount of time
for proper machine setup and training. Your participation and assistance are critical to
an effective installation.
Содержание EDGE-2
Страница 8: ...vi 3UH QVWDOODWLRQ XLGH...
Страница 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Страница 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Страница 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Страница 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Страница 112: ...SSHQGL A 6 NOTES SKETCHES...
Страница 120: ...SSHQGL A 14 NOTES SKETCHES...