8
M2 ASSEMBLY GUIDE
1. Attach three L-brackets to Sled by aligning with six small
predrilled holes, tall side toward center, using Phillips
screwdriver and G1 screws.
2. Attach three L-brackets to rectangular brackets on ring. Insert
G2 bolts from inside of ring bracket out through L-brackets, two
per bracket and secure with G3 wingnuts.
3. Hang both bearing carrige mounts by placing on each side of
attached ring.
4. Assemble both roller bearing carriages by feeding F1 bolt
through carriage, then F2 washer, then bearing, then F2 washer,
out through the other end of the carriage, and attach with F3 nut.
Use F4 Allen wrench on one end and 13mm combo wrench on the
other to tighten.
5. Peal off protective paper from acrylic dust cover.
6. Attach both C1 brick mounts by inserting C2 bolt from bottom,
with C3 washer and C4 wingnuts. Repeat on other side with C5
nut using 10mm combo wrench.
M2 ASSEMBLY PART 1: SLED ASSEMBLY (BAG C, BAG F, BAG G)
Shoulder
bolt
Ring
bearing
Washer
Washer
Nut
TOP VIEW
SIDE VIEW
Drew’s Note:
You can install
the bricks in this step, but
another, easier option is to
attach the bricks to the sled
after you have hung the M2
from the chains in the center of
your wasteboard.
This work is licensed under the creative commons Attribution
NonCommercial-NoDerivatives 4.0 International license.
Last Updated 11.09.2020
Version 1.14