
21
M2 ASSEMBLY GUIDE
M2 ASSEMBLY PART 6: MOUNT CHAINS TO FRAME (BAG A AND BAG B)
1. On left side of top beam, measure 14” (35cm) toward center
and 1” (2.5cm) up from bottom. Insert small A3 nail through loop
in last chain link and hammer into that spot. Repeat process on
right side.
2. Drape chains over top of sprockets, so they can loop toward
the center.
3. Measure 31” (78cm) on right side chain from nail toward
center of top beam. Place A2 sprocketin loop and attach B1 quick
Link, with opening facing out. Repeat process on left side.
4. On right side, attach spring and tighten quick link, with link nut
facing away from beam.
Drew’s Note:
We recommend a friend help connect the spring
and each person wear safety goggles during stretching. The chain
can snap back causing damage to people and surroundings!
The M2 moves in the X and Y position by the use of chains
connected to the motors. This guide is how to install the chains
that came with your M2 on a standard 4’x8’ frame with a 10’ Top
Beam.
Also, the large nail and spacer (A4 and 5) are extra parts for
custom frame designs!
5. Stretch out spring from right side and attach end to open quick
link on left side, tighten quick link.
This work is licensed under the creative commons Attribution
NonCommercial-NoDerivatives 4.0 International license.
Last Updated 11.09.2020
Version 1.14