![MAK M20 Скачать руководство пользователя страница 376](http://html1.mh-extra.com/html/mak/m20/m20_operating-instructions-manual_3784461376.webp)
Maintenance / Disassembly and reassembly
en / 16.06.1997
IB003279
1/4
07
See also:
Spare parts list:
Time requirement:
1 Pers./ 1,00 h
Personnel qualification: skilled engine hand
----------------------------------------------------------------------------------------------------------------------
Operating medium:
Heavy fuel and distillate fuel
Maintenance:
Disassemble injection pump if required, clean all parts and replace if necessary.
Observe note!
Auxiliary material:
Molykote paste “G-Rapid Plus” *
Vaseline *
** or a product of equal standard
Note:
All parts of the injection pump are manufactured with utmost precision in special
workshops. This is the only guarantee for proper function. When repairing a pump, it is
to be ensured that the various components of the pump, e.g. control sleeve, control rack,
rack pointer etc. remain together with their
respective
housing.
Plunger and barrel must be renewed as a unit only. In order to keep repair costs low,
any parts to be reconditioned should be shipped only complete, and the possibility of
interchanging must be excluded. Lapped surfaces must be preserved and not touched
with fingers.
Sequence of operations:
1.
Disassembly
1.1
Clean the outside of the injection pump.
1.2
Remove and check impact screws (
Fig. 1
/1 and 2).
1.3
Clamp injection pump upwards with injection pump bottom part (3).
Содержание M20
Страница 5: ...Technical engine data A1 M20 M601C en 31 10 2001 AA000103 1 1 Technical engine data...
Страница 6: ...Governor data A1 04 en 18 02 2000 AA000097 1 1 Governor data not installed on CD Rom...
Страница 10: ...Acceptance Test Records A1 10 en 16 11 1999 AA000095 1 1 Acceptance test records not installed on CD Rom...
Страница 11: ...Operating instructions A3 M20 M601C en 31 10 2001 AA000108 1 1 Operating instructions...
Страница 30: ...Initial operation Engine A3 05 00 en 14 02 2001 BA000022 1 1 Initial operation...
Страница 44: ...Operational supervision Engine A3 06 00 en 15 02 2001 BA000058 1 1 Operational supervision...
Страница 64: ...Removal from operation Engine A3 07 00 en 16 02 2001 BA000094 1 1 Removal from operation...
Страница 71: ...Danger of frost Engine A3 08 00 en 16 02 2001 BA000106 1 1 Danger of frost...
Страница 83: ...Running in Engine A3 10 00 en 16 02 2001 BA000242 1 1 Running in...
Страница 85: ...Fault tracing Engine A3 11 00 en 19 02 2001 BA000130 1 1 Fault tracing...
Страница 91: ...Emergency operation Engine A3 12 00 en 19 02 2001 BA000142 1 1 Emergency operation...
Страница 102: ...Operating media A4 en 31 10 2001 AA020105 1 1 Operating media...
Страница 106: ...Regulations and care Engine A4 05 00 en 21 02 2001 BA000158 1 1 Regulations and care...
Страница 137: ...Maintenance A5 en 31 10 2001 AA000026 1 1 Maintenance...
Страница 166: ...Periodical schedule Heavy fuel A5 04 02 M20 en 31 10 2001 AA021679 8 8...
Страница 242: ...Bearing Shells Inspection Evaluate A5 05 02 03 07 01 M20 en 13 06 1997 IB001449 3 4 02 1 2 3...
Страница 243: ...Bearing Shells Inspection Evaluate A5 05 02 03 07 01 M20 en 13 06 1997 IB001449 4 4 02 4 5 6...
Страница 435: ...Table of contents A6 01 en 31 10 2001 AA020050 1 1 Tools A6 Table of contents A6 01...