Majestic  MARQ36IN-B, MARQ42IN-B Installation Manual  •  2614-980 Rev. D  •  4/19

Installation Standard Work Checklist

Customer:          

Lot/Address:

Model (circle one):   MARQ36IN-B, MARQ42IN-B

Date Installed:          

Location of Fireplace:

Installer:

Dealer/Distributor Phone # 

Serial #:

Comments Communicated to party responsible ____________________ by ______________________on ___________  

 

  

                                                  (Builder / Gen. Contractor/)                (Installer)                        (Date) 

 =  Contains updated information.

Hearth & Home Technologies recommends the following:

•  Photographing the installation and copying this checklist for your file.  

•  That this checklist remain visible at all times on the appliance until the installation is complete. 

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in 

this installation manual.

WARNING! Risk of Fire or Explosion! 

Failure to install appliance according to these instructions can lead to a 

fire or explosion.  Install ONLY components and accessories approved by Hearth & HOme Technologies.  Unap

-

proved components and accessories could cause fireplace to overheat.

ATTENTION INSTALLER:

Follow this Standard Work Checklist

Appliance Install Information   

                     YES     IF NO, WHY?

Verified clearances to combustibles requirements are maintained. (Pg. 11-12)                              ___________________                         

Verified that the chase is insulated and sealed. (Pg. 13) 

 

              ___________________

Verified mantel and wall clearance requirements are maintained. (Pg. 48-49)                                ___________________

Verified hearth extension requirements are maintained. (Pg. 15)                                                    ___________________

Verified appliance is leveled and secured. (Pg. 31)                                                                         ___________________

Verified required factory-supplied non-combustible board installed. (Pg. 32)                                            ___________________

Venting/Chimney  Section 7 (Pg. 33-38)

Verified venting configuration complies to vent diagrams. 

 

              ___________________

Verified venting installed, locked and sealed/secured in place.  

                                  ___________________

Verified venting meets clearance to combustible requirements.                                                      ___________________

Verified wall/ceiling firestops are installed (if applicable). 

 

              ___________________

Verified attic insulation shield is installed (if applicable).  

 

              ___________________

Verified Exterior wall/Roof flashing is installed and sealed. 

 

              ___________________

Verified termination cap is installed and sealed. 

 

              ___________________

Electrical  Section 8 (Pg. 39-42) 

Verified unswitched power (110-120 VAC) provided to the appliance. 

 

              ____

_______________

Verified wall switch wires are properly installed (if applicable). 

 

              ___________________

Gas  Section 9 (Pg. 45-50)

Verified appliance is using proper fuel type.  

 

              ___________________

If converted, verified proper fuel conversion kit was used. 

 

              ___________________

Verified that gas components (fittings, pressure taps, etc) are leak free and fireplace is                                                                            

operating under correct pressures.                                                                                                          ___________________            

Finishing  Section 10 (Pg. 45-50)

Verified that finish material does not interfere with install/operation of decorative barrier front        

       ___________________

Verified combustible materials are not

 

installed in non-combustible areas.   

              ___________________

Verified all clearances meet installation manual requirements. 

 

              ___________________

Verified mantels/wall projections comply with installation manual requirements. 

 

              ___________________

Appliance Setup  Section 11 (Pg. 51-62)

Verified all packaging and protective materials are removed (inside & outside of appliance).                ___________________

Verified Teco-Sil installed and properly fogged with black high temperature paint.                         ___________________

Verified Lava Rock, Mystic Embers, Glowing Embers, and logs installed correctly.                        ___________________

Verified fixed glass assembly installed and secured.                                                                       ___________________

Verified that a required decorative door option is installed properly.                                                ___________________

Verified remote control has been programmed and is fully functional.                                             ___________________

Verified proper air shutter setting for installation type and vent configuration.                                 ___________________

Manual bag and all of its contents are removed from inside/under 

     the appliance and given to party responsible for use and operation.                                          ___________________ 

   

                                                                                   

2614-982  1/19

Comments:

 Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective 

action needed ____________________________________________________________________________________

Содержание MARQUIS MARQ36IN-B

Страница 1: ...nstalled for the protection of children and other at risk individuals DO NOT store or use gasoline or other flam mable vapors and liquids in the vicinity of this or any other appliance What to do if y...

Страница 2: ...E Use of Elbows 18 F Measuring Standards 18 F Measuring Standards 19 G Vent Diagrams 20 G PVLP SLP and PVI SLP B Information 26 5 Vent Clearances and Framing A Pipe Clearances to Combustibles 27 B Wal...

Страница 3: ...ified attic insulation shield is installed if applicable ___________________ Verified Exterior wall Roof flashing is installed and sealed ___________________ Verified termination cap is installed and...

Страница 4: ...ally wired and grounded in accordance with local codes or in the absence of local codes with National Electric Code ANSI NFPA 70 latest edition or the Canadian Electric Code CSA C22 1 A 110 120 VAC ci...

Страница 5: ...gas fu eled heating appliance or equipment The sign shall read in print size no less than one half 1 2 in in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OB STRUCTIONS Inspection The state or local...

Страница 6: ...1 4 in Plumb line Safety glasses Gloves Wrenches Reciprocating saw 1 4 in nut driver Non corrosive leak check solution 1 2 3 4 in length 6 or 8 Self drilling screws Caulking material 300 F minimum co...

Страница 7: ...on Follow these instructions carefully during the installation to ensure maximum safety and benefit WARNING Risk of Fire or Explosion Damaged parts could impair safe operation DO NOT install damaged i...

Страница 8: ...le MARQ36IN B A B D C E I L M N O P R Q GAS ACCESS ELECTRICAL ACCESS J K HEAT MANAGMENT SYSTEMS ACCESS BOTH SIDES S diameter H F G T U HEAT MANAGMENT SYSTEMS ACCESS BOTH SIDES S diameter APPLIANCE DIM...

Страница 9: ...Appliance Dimensions Table MARQ42IN B Figure 3 2 Appliance Dimensions MARQ42IN B APPLIANCE DIMENSION DIAGRAM MARQ42IN B Location Inches Millimeters L 65 5 16 1659 M 16 406 N 32 11 16 830 O 3 7 8 98 P...

Страница 10: ...GRAM Figure 3 3 Decorative Barrier Front Dimensions See Section 10 for facing and finishing detail 1 5 16 IN 33 mm 3 5 8 IN 92 mm 40 11 16 IN 1033 mm 36 13 16 IN 935 mm 35 9 16 IN 903 mm FSMQ36 MARQ36...

Страница 11: ...ppliance should be lo cated out of traffic and away from furniture and draperies NOTICE Illustrations reflect typical installations and are FOR DESIGN PURPOSES ONLY Illustrations diagrams are not draw...

Страница 12: ...n Combustible Zone NO COMBUSTIBLES IN HATCHED AREA 1 2 IN BUILDING MATERIAL MAY BE COMBUSTIBLE FACTORY SUPPLIED 1 2 IN NON COMBUSTIBLE BOARD PIPE IS FOR VISUAL REFERENCE ONLY 1 IN COMBUSTIBLES NOT ALL...

Страница 13: ...utside building envelope in any manner Walls ceiling base plate and cantilever floor of the chase should be insulated Vapor and air infiltration barriers should be installed in the chase as per region...

Страница 14: ...ight Rough Opening Height Rough Opening Depth Rough Opening Width Clearance to Ceiling MARQ36IN B Inches 10 56 80 3 8 24 59 1 2 52 Millimeters 254 1422 2042 610 1511 1321 MARQ42IN B Inches 10 61 85 3...

Страница 15: ...red the appliance must be raised by the equivalent height to ensure that the hearth extension does not interfere with the installation of the glass assembly required for fireplace operation See Figure...

Страница 16: ...nce is only approved for use with Hearth Home Technologies DVP or SLP venting systems Re fer to Section 12 A for vent component information and dimensions DO NOT mix pipe fittings or joining methods f...

Страница 17: ...he combustion air inlet to any other appliance termination mechanical or non mechanical 12 in 305 mm 12 in 305 mm I Clearance to a mechanical powered air supply inlet All mechanical air intakes within...

Страница 18: ...ches Millimeters DVP4 4 102 2 3 4 70 DVP6 6 152 4 1 4 108 DVP12 12 305 8 1 2 216 DVP24 24 610 17 432 DVP36 36 914 25 1 2 648 DVP48 48 1219 34 864 DVP6A 3 to 6 76 to 152 2 1 8 4 1 4 54 108 DVP12A 3 to...

Страница 19: ...e Section 12 A Figure 12 1 for information on effective length of pipe components Horizontal terminations are measured to the outside mounting surface flange of termination cap see Figure 4 7 Vertical...

Страница 20: ...ane MARQ42IN B NG V1 Minimum H1 Maximum 2 ft 610 mm 7 in 178 mm 2 5 ft 762 mm 17 in 432 mm 3 ft 914 mm 2 ft 610 mm 4 ft 1 2 m 4 ft 1 2 m 5 ft 1 5 m 9 ft 2 7 m 6 ft 1 8 m 12 ft 3 7 m 7 ft 2 1 m 14 ft 4...

Страница 21: ...ft 1 2 m 3 ft 914 mm 5 ft 1 5 m 7 ft 2 1 m 6 ft 1 8 m 10 ft 3 0 m 7 ft 2 1 m 14 ft 4 3 m 8 ft 2 4 m 16 ft 4 9 m 9 ft 2 7 m 18 ft 5 5 m 10 ft 3 0 m 20 ft 6 1 m V1 H1 H2 60 ft Maximum H1 H2 20 ft Maxim...

Страница 22: ...X V2 7 ft 2 1 m 14 ft 4 3 m H2 Max 2 X V2 10 ft 3 0 m 20 ft 6 1 m H2 Max 2 X V2 Shaded area of chart is for MARQ42IN B Propane V1 H1 must be adhered to V2 has no specific restrictions EXCEPT Ht max 2...

Страница 23: ...the system with the chart to find the appropriate position to set the exhaust restrictor See Table 4 1 5 Center the two exhaust restrictor pieces on the vent at the setting selected in step 3 and secu...

Страница 24: ...0 ft 15 2 m Max After V1 6 ft then H1 Max V1 x 2 Note Flue restrictor is permit ted ONLY on 30 ft minimum vertical runs with no elbows H1 V1 V2 Two Elbows Top Vent Vertical Termination continued Figur...

Страница 25: ...tions EXCEPT after V1 6 ft then HTOTAL Max 2 x V1 VTOTAL HTOTAL 50 ft 15 2 m Max Note Flue restrictor is permit ted ONLY on 30 ft minimum vertical runs with no elbows INSTALLED HORIZONTALLY H1 H2 V1 V...

Страница 26: ...2 The power vent draft flow must be adjusted and set per the specifications in Table 4 2 Refer to the instructions provided with the PVLP SLP and PVI SLP B for more specific information Setting the P...

Страница 27: ...nstal lation of a horizontal termination cap Note Heat shields MUST overlap by a minimum of 1 1 2 in 38 mm DVP heat shield designed to be used on a wall 4 in to 7 1 4 in 102 mm to 184 mm thick If wall...

Страница 28: ...round the vent Insulation must be kept back from the pipe to prevent overheating Figure 5 3 Installing Ceiling Firestop Figure 5 4 Installing the Attic Shield INSTALL ATTIC INSULATION SHIELDS BEFORE O...

Страница 29: ...f the appliance See Figure 5 5 Remove the knockouts from the appliance with a tin snips Center the duct collar around the exposed hole and attach it to the appliance with 3 screws Note Do this BEFORE...

Страница 30: ...s the shipping location of the seal cap and heat shields Section 6 splatter guard and finishing templates Section 10 and the logs Section 11 2 Remove seal cap from top of appliance by removing one scr...

Страница 31: ...cure the appliance to the framing members See Figure 6 3 and Figure 6 5 for location of nailing tabs in shipping position Bend out side nailing tabs 90 degrees See Figure 6 4 Place the appliance into...

Страница 32: ...shipped fastened to the top surround Remove finishing templates prior to installing non combustible board Remove non combustible facing pieces from back of appliance See Figure 6 6 Install non combust...

Страница 33: ...er than 1 2 in 13 mm If predrilling screw holes DO NOT penetrate inner pipe All outer pipe joints must be sealed using one of the meth ods below including the slip section that connects directly to th...

Страница 34: ...nner flue is not required All unit collar pipe slip section elbow and cap outer flues shall be sealed B Assemble Slip Sections Slide the inner flue of the slip section into the inner flue of the pipe...

Страница 35: ...ted every 8 ft 2 44 m after the maximum allowed 25 ft 7 62 m of unsupported rise Vertical runs originating off the rear of the appliance or after any elbow must be supported every 8 ft 2 44 m Horizont...

Страница 36: ...inst the pipe section Seal around the top of the storm collar See Figure 7 13 E Vertical Termination Requirements Install and Seal Metal Roof Flashing See minimum vent heights for various pitched roof...

Страница 37: ...ermination cap shown in Figure 7 14 Heat shields must overlap 1 1 2 in 38 mm mini mum There are two sections of the heat shield One section is factory attached to the wall shield firestop The other se...

Страница 38: ...verlap of flue telescoping section is required Failure to maintain overlap may cause overheating and fire Vent termination must not be recessed in the wall Siding may be brought to the edge of the cap...

Страница 39: ...in the same wall box 8 Electrical Information Junction Box Installation The electrical junction box can be accessed three ways during installation 1 Through the side electrical access Remove two screw...

Страница 40: ...ess controls be used for their fea tures and functionality with the IntelliFireTM Touch igni tion system Figure 8 2 Junction Box Detail Electrical Service and Repair WARNING Risk of Shock Label all wi...

Страница 41: ...of Shock or Explosion DO NOT wire IFT controlled appliance junction box to a switched circuit Incorrect wiring will override IFT safety lockout Refer to Figure 8 3 or 8 4 IFT Wiring Diagram This appl...

Страница 42: ...BOX 110 120 VAC LED CONTROL RF MODULE ADAPTER I S 6 PIN RED BLK ORANGE PILOT GREEN MAIN GRN WHT BLK RED BLK RED BLK IFT RC400 REMOTE CONTROL RED BLK BRN BRN JUMPER WIRE BRN WIRE ASSEMBLY MODULE RESET...

Страница 43: ...or upstream of valve if line pressure is greater than 1 2 psig Gas Pressure Natural Gas Propane Minimum inlet pressure 5 0 in w c 11 0 in w c Maximum inlet pressure 10 0 in w c 13 0 in w c Manifold pr...

Страница 44: ...for minimum vertical maximum horizontal vent run for this appliance 2 ft vertical and 7 in horizontal MARQ36IN B and 3 ft vertical and 10 in horizontal MARQ42IN B Factory Pre Set Air Shutter Settings...

Страница 45: ...materials beyond the min imum clearances Comply with all minimum clearanc es to combustibles as specified in this manual Ma terials overlapping into non combustible zones could ignite and will interf...

Страница 46: ...thod The finishing template pieces are required for installations that require more than one inch thick finishing materials to be installed over the face of the factory supplied 1 2 inch non combustib...

Страница 47: ...MARQ42IN B Installation Manual 2614 980 Rev D 4 19 Note A thin layer of mortar may be applied over the visible non combustible board between finishing material and the fireplace opening Figure 10 5 Fi...

Страница 48: ...MIN FIREPLACE OPENING COMBUSTIBLE OR NON COMBUSTIBLE WALL 14 IN MIN COMBUSTIBLE COLUMN 6 IN MAX 1 2 IN BUILDING MATERIAL FACTORY SUPPLIED NON COMBUSTIBLE BOARD Figure 10 6 Combustible Mantel Leg and W...

Страница 49: ...ce 12 10 56 FIREPLACE OPENING 1 1 4 IN 1 2 IN NON COMBUSTIBLE MATERIAL MARQ36IN B MAX MIN Measurement from fireplace opening to bottom of appliance 35 3 16 IN MARQ36IN B Figure 10 11 Combustible Mante...

Страница 50: ...aintained with finishing material with thickness greater than 1 inch A B COMBUSTIBLE MATERIAL Figure 10 11 Inside Fit Decorative Barrier Fronts The decorative barrier fronts approved for use with this...

Страница 51: ...to the lower right corner of the appliance Remove tool by removing one screw See Figure 11 1 If glass clip removal tool becomes misplaced a cotter pin removal tool may be used 2 To disengage bottom g...

Страница 52: ...he bottom glass clip location The MARQ36IN B has three tabs and the MARQ42IN B has four tabs If the glass is not centered it cannot be installed proper ly Align the notch at the top center of the glas...

Страница 53: ...sawdust that may have accumulated inside the firebox or underneath in the control cavity E Lava Rock Placement 1 Apply the lava rock as shown in Figure 11 9 The lava is to be placed around the base he...

Страница 54: ...Teco Sil is shipped with the appliance To place Teco Sil Locate and open the bag of Teco Sil Spread Teco Sil evenly over bottom glass assembly See Figure 11 11 Turn ember lights on and fog Teco Sil to...

Страница 55: ...Log 2 2270 703 03 Log 3 2270 702 02 Log 4 2270 704 04 CAUTION Logs are fragile Carefully remove the logs from the packaging 1 3 4 5 6 7 Log 5 2270 706 06 Log 6 2271 707 17 Log 7 2271 705 15 Logs can b...

Страница 56: ...rear cross member of grate assembly Be sure that the log is pushed back against the two vertical tabs for proper placement See Figure 5 Figure 4 Figure 2 Figure 3 Figure 5 Figure 6 LOG PLACEMENT SLOTS...

Страница 57: ...Figure 10 Figure 12 Figure 13 Figure 8 Figure 11 Log 4 2270 704 See Log 4 in Figure 10 Position Log 4 between grate tine and firebox wall Rest the end of Log 4 on the flat area on Log 1 and pivot the...

Страница 58: ...7 Position Log 6 onto flat spots on Log 2 and Log 3 The locking feature in Log 6 will mate with the cleft in Log 2 See Figures 14 15 Log 7 2271 705 Position Log 7 in the center of the firebox mating w...

Страница 59: ...703 13 Log 3 2271 702 12 Log 4 2271 704 14 CAUTION Logs are fragile Carefully remove the logs from the packaging 1 3 4 5 6 7 Log 5 2271 706 16 Log 6 2271 707 17 Log 7 2271 705 15 Logs can be identifi...

Страница 60: ...ear cross member of grate assembly Be sure that the log is pushed back against two vertical tabs for proper placement See Figure 5 Figure 4 Figure 2 Figure 3 Figure 5 Figure 5 LOG PLACEMENT SLOTS 2 Fi...

Страница 61: ...n Figure 8 Log 3 will rest on recess in Log 1 and the pilot shield See Figure 9 Figure 9 Figure 10 Figure 12 Figure 8 Figure 11 Log 4 2271 704 See bottom of Log 4 in Figure 10 The two grooves will mat...

Страница 62: ...right front grate tine mating with the recess on Log 4 See Figure 13 14 Log 7 2271 705 Position Log 7 in the center of the firebox mating with recesses in Log 1 and Log 5 Log 7 will rest on top of Log...

Страница 63: ...m Setup Detailed instructions for electrical wiring and connec tions are provided in Section 8 Verify that the 3 Position switch on the IFT ECM is switched to the REMOTE position Detailed Operat ing I...

Страница 64: ...P Pipe see chart Effective Height Length 4 7 8 in 124 mm 13 mm 10 in 254 mm 1 1 2 in 38 mm 5 in 127 mm 12 in 305 mm UP DVP HVS Vent Support 12 in 305 mm 14 in 356 mm 1 in 25 mm 8 in 203 mm 6 in 152 mm...

Страница 65: ...m The heat shield is designed to be used on a wall 4 in to 7 1 4 in 102 mm to 184 mm thick If wall thickness is less than 4 in 102 mm the existing heat shields must be field trimmed If wall thickness...

Страница 66: ...OL ADDM Cap Shield 11 5 8 in 295 mm 5 3 4 in 146 mm 7 1 8 in 181 mm 12 1 8 in 308 mm DVP BEK2 DVP HPC Cap Brick Extension 13 7 8 in 352 mm 5 in 127 mm 11 7 8 in 302 mm DVP TRAPFL Flashing 26 in 660 mm...

Страница 67: ...WH100 PVI SLP B Power Vent Inline SLP LPC SLP Low Profile Cap Note Wire harnesses required to power the PVI SLP B connect to the appliance and are ordered separately from PVI SLP B Contact your dealer...

Страница 68: ...order Figure 12 5 PVLP SLP Vent Components PVLP HS Heat Shield 14 IN 356 mm 15 1 2 IN 394 mm 11 1 2 IN 292 mm 8 IN 203 mm 4 3 8 IN 112 mm 10 IN 254 mm 5 1 4 IN 135 mm 2 1 4 IN 57 mm 9 1 2 IN 241 mm 4...

Страница 69: ...oducts com Please contact your Majestic dealer with any questions or concerns For the location of your nearest Majestic dealer please visit www majesticproducts com B Accessories Install approved acce...

Отзывы: