57
Hearth & Home Technologies • DVLINEAR36 Installation Manual • 2569-980 Rev. E • 11/20
Figure 10.6 Combustible and Non-Combustible Mantel Leg
or Wall Projections
(Acceptable on both sides of opening)
2 IN. MIN.
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
CEILING
CEILING
2 IN. MIN.
DO NOT INSTALL
FINISHING MATERIAL
ON THIS SURFACE.
2 IN. MIN. OPENING
MUST NOT BE
BLOCKED
CEILING
12-1/4 IN.
8-3/4 IN.
SIDE DISCHARGE
(DISCHARGE SLOTS ON BOTH SIDES OF APPLIANCE)
FRONT DISCHARGE
OPEN TOP DISCHARGE
Figure 10.8 Finishing Material installed with Passive Heat Optional Heat Management System
Finishing Material Installed with Passive Heat Optional Heat Management System