background image

25

DVHVAC36

10001195

Maintenance

1.  It is important to keep the burner and the burner 

compartment clean. This must be done periodically, 
at least once per season.

2.  Clean the brass trim using a soft clean cloth, slightly 

dampened with lemon oil and buff with a soft clean 
cloth. DO NOT use brass polish or household clean-
ers as these products will damage the brass trim. 
Lemon oil can be obtained at supermarkets or hard-
ware stores.

3.  Periodically check and clean the air circulating 

blower wheel of any debris. Blower motors are 
prelubricated for extended bearing life. No further 
lubrication is required. WARNING: Disconnect power 
before servicing the air circulating blower.

4.  The air filter should be inspected monthly and re-

placed when necessary with a 16" x 16" x 1" filter.

5.  When servicing, check all electrical wiring for loose 

connections.

WARNING: Disconnect power before serv-
icing.

6.  Contact your local representative to arrange an an-

nual service program.

Cleaning the Standing 

Pilot Control System

The burner and control system consist of:

• 

burner tube 

 gas orifice

• 

pilot assembly 

 thermopile

• 

millivolt gas valve

Most of these components may require only an 
occasional checkup and cleaning and some may 
require adjustment. 

If repair is necessary, it should 

be performed by a qualified technician.

1.  Turn off pilot light at gas valve.
2.  Allow fireplace to cool if it has been operating.
3.  Remove window frame assembly. (Refer to Window 

Frame Assembly Removal section.)

4.  Remove logs.
5.  Vacuum burner compartment especially around 

orifice primary air openings.

6.  Visually inspect pilot. Brush or blow away any dust 

or lint accumulation.

7.  Reinstall logs.
8.  Ignite pilot - Refer to Lighting Instructions.
9.  Reinstall window frame assembly.
To obtain proper operation, it is imperative that the pilot 
and burner’s flame characteristics are steady, not lifting 
or floating.
Typically, the top 3/8” to 1/2” (10mm or 13mm) of the 
thermopile should be engulfed in the pilot flame. (Refer 
to Page 21, Figure 40)
To adjust pilot burner: (by qualified service technician)
1.  Remove pilot adjustment cap 
2.  Adjust pilot screw to provide properly sized flame.
3.  Replace pilot adjustment cap.
The primary air shutter is set at factory and should 
only be adjusted, if necessary, by a qualified service 
technician.

Содержание DVHVAC36

Страница 1: ...cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS...

Страница 2: ...eral Venting 9 General Venting Information Termination Location 10 General Information Assembling Vent Pipes 11 Twist Lock Pipes 11 How to Use the Vent Graph 12 Sidewall Venting Graph 12 Corner Instal...

Страница 3: ...at the gas valve and pilot light are turned off before you attempt to clean this re place 7 The venting system chimney of this replace should be checked at least once a year and if needed your venting...

Страница 4: ...ci cations Ref DVHVAC36 Ref DVHVAC36 A 36 914 mm N 9 245 mm B 34 870 mm O 6 175 mm C 21 533 mm P 2 58 mm D 33 838 mm Q 2 51 mm E 63 1621 mm R 3 97 mm F 70 1780 mm S 4 102 mm G 16 410 mm T 1 2 13 mm H...

Страница 5: ...Remove the access panel on the front of the air cir culating blower section by removing the 10 24 nuts Remove the jack plug from the air circulating blower motor by gently depressing tab 5 Attach the...

Страница 6: ...depth to suit facing material adjustable to 1 2 5 8 or 3 4 depths Fig 4 5 Screw through slotted holes in drywall strip and then screw into pre drilled holes on replace side Meas ure from face of repl...

Страница 7: ...f any part of it has been under water Immediately call a quali ed service technician to inspect the replace and replace any part of the control which has been under water Gas Inlet Manifold Pressures...

Страница 8: ...test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use only approved ttings When using black iron pipe always provide a un...

Страница 9: ...BLUE R W1 G Y GND CHASSIS GND 24 VAC RTN 24 VAC HOT TH TP PILE TH PILE THERMOPILE GAS VALVE TP TH TP TH EMERGENCY HEAT SWITCH 14 YELLOW 15 BLUE 13 BLUE 12 YELLOW RED WHITE L1 L2 TP TH TH LIMIT 16 YELL...

Страница 10: ...3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other app...

Страница 11: ...suggest putting a lubricant Vaseline or similar on the male end of the twist lock pipe prior to assembly TWL100 Twist Lock Pipe 3 12 99 djt Male End Female End Screw Holes TWL100 Fig 11 Twist lock pip...

Страница 12: ...se applications Refer to Venting Components listed for different installation requirements The maximum horizontal distance between the rear of the appliance and the outside face of the rear wall is 20...

Страница 13: ...rmination 4 collar into the 4 pipe then the 7 collar into the 7 pipe Do not force the venting into position If the pipes do not line up with the termina tion collars disassemble elbows or pipes and re...

Страница 14: ...alled in either the vertical or horizontal run When one 1 90 elbow is installed directly onto another off the back of the replace the maximum horizontal vent length is 36 914 mm Fig 19 For each 45 elb...

Страница 15: ...4 100 Vent Opening 2 99 djt Vent Opening for Combustible Wall 9 240 mm 9 240 mm Fireplace Hearth Framing Detail Vent Opening for Noncombustible Wall 7 190 mm VO584 100 Fig 22 Locate vent opening on wa...

Страница 16: ...uirement STEP 7 Support the horizontal pipes every 36 914 mm with metal pipe straps Make sure the horizontal vent pipe is installed on a level horizontal plane STEP 8 Re check the replace to make sure...

Страница 17: ...pe Straps Every 3 914mm CFM148 Fig 30 Support straps for horizontal runs Up to two 2 45 elbows may be used within the horizontal run For each 45 elbow used on the hori zontal level the maximum horizon...

Страница 18: ...and 7 collars of vertical vent termination and install If there is a room above ceiling level restop spacers must be installed on both the bottom and the top side of the ceiling joists If an attic is...

Страница 19: ...ustable length 7TDVP3566 35 to 64 adjustable length Pipe sections for vertical or horizontal venting Model 7TDVP8 Model 7TDVP12 Model 7TDVP24 Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS At...

Страница 20: ...other airborne particles to cling to the glass surface Also initial paint curing may deposit a slight lm on the glass It is therefore recommended the glass FP1405 DVHVAC remove glass frame 8 03 Clamps...

Страница 21: ...to the ON position This will turn on the replace burner in a low re condition The unit will provide heat to the room in which the replace is installed When power is restored toggle the emergency heat...

Страница 22: ...and logs 2 Place refractory side supports so that the hole ts over the screw head on the rebox oor 3 Place refractory base sides on the oor of the re box 4 Attach adjustable tabs packed with refracto...

Страница 23: ...the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any replace Do not touch any electric switch Do not use any phone in your buildi...

Страница 24: ...An interrupter block not supplied must be used to conduct this test 3 Pilot burning no gas to A Thermostat or wires defective Check wall switch and wires for proper connections main burner Valve knob...

Страница 25: ...tem consist of burner tube gas ori ce pilot assembly thermopile millivolt gas valve Most of these components may require only an occasional checkup and cleaning and some may require adjustment If repa...

Страница 26: ...C parts 7 02 4a b 1e 1f 1d 1c 1b 1a 1195 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time without notice DVHV...

Страница 27: ...t 54273 8b Ori ce Pilot Prop 54272 9 Pilot 3 Way 10001295 10 Pilot Tubing w ttings 53211 11 Manifold Tubing w ttings 57318 12 Thermocouple 53373 13 Thermopile 51827 14 Electrode Ignitor w cable 100012...

Страница 28: ...ang bay window assembly over existing window frame assembly Do not remove existing window frame as sembly 6 Re install upper louvre assembly Remove all plastic from brass trims 7 Bottom brass trim is...

Страница 29: ...29 DVHVAC36 10001195...

Страница 30: ......

Страница 31: ...mageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered...

Страница 32: ...EnerGuide Ratings Steady State D O E Fireplace Ef ciency Fan OFF Fan ON AFUE DVHVAC36RN 76 83 84 77 1 DVHVAC36RP 76 84 85 77 1 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmc...

Отзывы: