background image

15

DVHVAC36

10001195

• 

IMPORTANT

 

 Minimum clearance between vent 

pipes and combustible materials is 1" (25mm) on bot-
tom, sides and top.

A vent starter kit plus a transition elbow 
must be used in Vertical Sidewall Installa-
tions. The 4" pipe must be centered inside 

the 7" pipe coming off the transition elbow. 

Canadian & USA Installations:

The venting system must conform with local codes, or 
in the absence of local codes, with the National Fuel 
Gas Code, ANSI Z223.1/NFPA 54 - latest edition, or 
CSA B149.1 Installation Code.
Only CFM Corporation venting components specifically 
approved and labelled for this fireplace may be used.

Vertical Sidewall Installations

STEP 1

Locate vent opening on the wall. It may be necessary 
to first position the fireplace and measure to obtain hole 
location. Depending on whether the wall is combustible 
or noncombustible, cut opening to size. (Fig. 22)
For combustible walls first frame in opening.

Combustible Walls

 (Fig. 22): Cut a 9

³⁄₈

" x 9

³⁄₈

" (240 x 

240 mm) hole through the exterior wall and frame.

Noncombustible Walls

 (Fig. 22): Hole opening must 

be 7

¹⁄₂

" (190 mm) in diameter.

VO584-100

Vent Opening

2/99   djt

Vent Opening for Combustible Wall

9

³⁄₈

"

(240 mm)

9

³⁄₈

"

(240 mm)

Fireplace 

Hearth

Framing 

Detail

Vent Opening for Noncombustible Wall

7

¹⁄₂

(190 mm)

VO584-100

Fig. 22

  Locate vent opening on wall.

STEP 2

Measure wall thickness and cut adjustable zero clear-
ance sleeve parts to proper length (MAXIMUM 12" / 
305mm). (Fig. 23) Adjust sleeve to minimum (9

³⁄₈

" x 9

³⁄₈

/ 240 x 240 mm) and attach to firestop with #8 sheet 
metal screws (supplied). Assemble sleeve and attach 
to firestop with #8 sheet metal screws (supplied). Install 
firestop assembly.

Zero clearance sleeve is only required for 
combustible walls.

ZCS101 

Zero Clearance Sleeve

3/11/99   djt

Max. Length 

12" (305 mm)

Adjustable 
Zero Clearance 
Sleeve

#8 Screws 

(2)

#8 Screws (2)

#8 

Screws 

(2)

Firestop

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 23

  Adjustable zero clearance sleeve.

STEP 3

Apply a bead of high temperature sealant to the inner 
and outer flue collars of the fireplace and using ap-
propriate venting component(s) attach to fireplace with 
three (3) screws. (Fig. 24) Follow with the installation 
of the inner  and outer elbow. Again, secure joints with 
three (3) sheet metal screws. Wipe off any excess high 
temperature sealant.

��������

CFM143

2/2/01    sta

CFM143

Ensure Pipes 

are Concentric

Bead of Seal-

ant 

(If Necessary)

Fig. 24

  Apply sealant to inner and outer pipe.

Содержание DVHVAC36

Страница 1: ...cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS...

Страница 2: ...eral Venting 9 General Venting Information Termination Location 10 General Information Assembling Vent Pipes 11 Twist Lock Pipes 11 How to Use the Vent Graph 12 Sidewall Venting Graph 12 Corner Instal...

Страница 3: ...at the gas valve and pilot light are turned off before you attempt to clean this re place 7 The venting system chimney of this replace should be checked at least once a year and if needed your venting...

Страница 4: ...ci cations Ref DVHVAC36 Ref DVHVAC36 A 36 914 mm N 9 245 mm B 34 870 mm O 6 175 mm C 21 533 mm P 2 58 mm D 33 838 mm Q 2 51 mm E 63 1621 mm R 3 97 mm F 70 1780 mm S 4 102 mm G 16 410 mm T 1 2 13 mm H...

Страница 5: ...Remove the access panel on the front of the air cir culating blower section by removing the 10 24 nuts Remove the jack plug from the air circulating blower motor by gently depressing tab 5 Attach the...

Страница 6: ...depth to suit facing material adjustable to 1 2 5 8 or 3 4 depths Fig 4 5 Screw through slotted holes in drywall strip and then screw into pre drilled holes on replace side Meas ure from face of repl...

Страница 7: ...f any part of it has been under water Immediately call a quali ed service technician to inspect the replace and replace any part of the control which has been under water Gas Inlet Manifold Pressures...

Страница 8: ...test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use only approved ttings When using black iron pipe always provide a un...

Страница 9: ...BLUE R W1 G Y GND CHASSIS GND 24 VAC RTN 24 VAC HOT TH TP PILE TH PILE THERMOPILE GAS VALVE TP TH TP TH EMERGENCY HEAT SWITCH 14 YELLOW 15 BLUE 13 BLUE 12 YELLOW RED WHITE L1 L2 TP TH TH LIMIT 16 YELL...

Страница 10: ...3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other app...

Страница 11: ...suggest putting a lubricant Vaseline or similar on the male end of the twist lock pipe prior to assembly TWL100 Twist Lock Pipe 3 12 99 djt Male End Female End Screw Holes TWL100 Fig 11 Twist lock pip...

Страница 12: ...se applications Refer to Venting Components listed for different installation requirements The maximum horizontal distance between the rear of the appliance and the outside face of the rear wall is 20...

Страница 13: ...rmination 4 collar into the 4 pipe then the 7 collar into the 7 pipe Do not force the venting into position If the pipes do not line up with the termina tion collars disassemble elbows or pipes and re...

Страница 14: ...alled in either the vertical or horizontal run When one 1 90 elbow is installed directly onto another off the back of the replace the maximum horizontal vent length is 36 914 mm Fig 19 For each 45 elb...

Страница 15: ...4 100 Vent Opening 2 99 djt Vent Opening for Combustible Wall 9 240 mm 9 240 mm Fireplace Hearth Framing Detail Vent Opening for Noncombustible Wall 7 190 mm VO584 100 Fig 22 Locate vent opening on wa...

Страница 16: ...uirement STEP 7 Support the horizontal pipes every 36 914 mm with metal pipe straps Make sure the horizontal vent pipe is installed on a level horizontal plane STEP 8 Re check the replace to make sure...

Страница 17: ...pe Straps Every 3 914mm CFM148 Fig 30 Support straps for horizontal runs Up to two 2 45 elbows may be used within the horizontal run For each 45 elbow used on the hori zontal level the maximum horizon...

Страница 18: ...and 7 collars of vertical vent termination and install If there is a room above ceiling level restop spacers must be installed on both the bottom and the top side of the ceiling joists If an attic is...

Страница 19: ...ustable length 7TDVP3566 35 to 64 adjustable length Pipe sections for vertical or horizontal venting Model 7TDVP8 Model 7TDVP12 Model 7TDVP24 Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS At...

Страница 20: ...other airborne particles to cling to the glass surface Also initial paint curing may deposit a slight lm on the glass It is therefore recommended the glass FP1405 DVHVAC remove glass frame 8 03 Clamps...

Страница 21: ...to the ON position This will turn on the replace burner in a low re condition The unit will provide heat to the room in which the replace is installed When power is restored toggle the emergency heat...

Страница 22: ...and logs 2 Place refractory side supports so that the hole ts over the screw head on the rebox oor 3 Place refractory base sides on the oor of the re box 4 Attach adjustable tabs packed with refracto...

Страница 23: ...the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any replace Do not touch any electric switch Do not use any phone in your buildi...

Страница 24: ...An interrupter block not supplied must be used to conduct this test 3 Pilot burning no gas to A Thermostat or wires defective Check wall switch and wires for proper connections main burner Valve knob...

Страница 25: ...tem consist of burner tube gas ori ce pilot assembly thermopile millivolt gas valve Most of these components may require only an occasional checkup and cleaning and some may require adjustment If repa...

Страница 26: ...C parts 7 02 4a b 1e 1f 1d 1c 1b 1a 1195 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time without notice DVHV...

Страница 27: ...t 54273 8b Ori ce Pilot Prop 54272 9 Pilot 3 Way 10001295 10 Pilot Tubing w ttings 53211 11 Manifold Tubing w ttings 57318 12 Thermocouple 53373 13 Thermopile 51827 14 Electrode Ignitor w cable 100012...

Страница 28: ...ang bay window assembly over existing window frame assembly Do not remove existing window frame as sembly 6 Re install upper louvre assembly Remove all plastic from brass trims 7 Bottom brass trim is...

Страница 29: ...29 DVHVAC36 10001195...

Страница 30: ......

Страница 31: ...mageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered...

Страница 32: ...EnerGuide Ratings Steady State D O E Fireplace Ef ciency Fan OFF Fan ON AFUE DVHVAC36RN 76 83 84 77 1 DVHVAC36RP 76 84 85 77 1 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmc...

Отзывы: