background image

17

DVHVAC36

10001195

1.  Establish vent hole through the wall. (Fig. 22)
2.  Remove soil to a depth of approximately 16" (406 mm) 

below base of snorkel. Install window well (not sup-
plied). Refill hole with 12" (305 mm) of coarse gravel 
leaving a clearance of approximately 4" (102 mm) 
below snorkel. (Fig. 28)

3.  Install vent system. Refer to Page 12, Steps 2 

through 5. 

4.  Ensure a watertight seal is made around the vent 

pipe coming through the wall.

5.  Apply high temperature sealant caulking (supplied) 

around the 4" and 7" snorkel collars.

6.  Slide into the vent pipe and  secure to the wall.
7.  Level the soil to maintain a 4" (102 mm) clearance 

below snorkel. (Fig. 28)

Do  not backfill around snorkel. A clearance 
of at least 4" (102 mm) must be maintained 
below the snorkel.

BG401

Snorkel

2/10/99   djt

Snorkel

Wall Screws

Sheet Metal 

Screws

BG401

Foudation Recess

Recess Bracket

Watertight Seal 

Around Pipe

Fig. 29

  Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This gas fireplace has been approved for:

• 

Vertical installations up to 40' (12 m) in height. Up to 
10' (3 m) horizontal vent run can be installed within 
the vent system using a maximum of three (3) 90° 
elbows.

 CFM148

Minimum 8' 

(2.4m)/ Maxi-

mum 40' (12m) 

Vertical Rise

Maximum 

10' (3m)

Pipe Straps Every 3' 

(914mm)

CFM148

Fig. 30

  Support straps for horizontal runs.

• 

Up to two (2) 45° elbows may be used within the 
horizontal run. For each 45° elbow used on the hori-
zontal level, the maximum horizontal length must be 
reduced by 18" (457 mm).

  Example: Maximum horizontal length:
  0 x 45° elbows = 10' (3 m) 
  1 x 45° elbows = 8

¹⁄₂

' (2.6 m)

  2 x 45° elbows = 7' (2.1 m)

• 

A minimum of an 8' (2.4 m) vertical rise.

• 

Two (2) sets of 45° elbows offset within these verti-
cal installations. From 0 to a maximum of 8' (2.4m) 
of vent pipe can be used between elbows. (Fig. 30)

• 

7DVCS must be used to support offsets. (Fig. 31) 
This application will require that you first determine 
the roof pitch and use the appropriate 7DVSKV (A, B 
or F). Refer to Venting Components on Page 21.

Vertical Through-the-Roof Installation

1.  Locate your fireplace.
2.  Plumb to center of the 4" flue collar from ceiling 

above and mark position.

3.  Cut opening equal to 9

³⁄₈

" x 9

³⁄₈

" (240 x 240 mm).

4.  Proceed to plumb for additional openings through 

the roof. In all cases, the opening must provide a 
minimum of 1" clearance to the vent pipe, i.e., the 
hole must be at least 9

³⁄₈

" x 9

³⁄₈

" (240 x 240 mm).

BG400

Below grade installation

2/10/99   djt

10/19/99  added standoffs

24" (608mm)

Minimum*

Zero Clearance 

Sleeve

Firestop

7" Pipe

7TDVSNORK

(Snorkel)

4" (102mm)

Clearance 

Min.

Window 

Well

Gravel

Drain

Foundation Wall

Screws

BG400

Fig. 28

  Below grade installation.

*A minimum of 24" (608mm) 

vertical pipe must be installed 

when using the 7TDVSNORK 

Kit.

Содержание DVHVAC36

Страница 1: ...cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS...

Страница 2: ...eral Venting 9 General Venting Information Termination Location 10 General Information Assembling Vent Pipes 11 Twist Lock Pipes 11 How to Use the Vent Graph 12 Sidewall Venting Graph 12 Corner Instal...

Страница 3: ...at the gas valve and pilot light are turned off before you attempt to clean this re place 7 The venting system chimney of this replace should be checked at least once a year and if needed your venting...

Страница 4: ...ci cations Ref DVHVAC36 Ref DVHVAC36 A 36 914 mm N 9 245 mm B 34 870 mm O 6 175 mm C 21 533 mm P 2 58 mm D 33 838 mm Q 2 51 mm E 63 1621 mm R 3 97 mm F 70 1780 mm S 4 102 mm G 16 410 mm T 1 2 13 mm H...

Страница 5: ...Remove the access panel on the front of the air cir culating blower section by removing the 10 24 nuts Remove the jack plug from the air circulating blower motor by gently depressing tab 5 Attach the...

Страница 6: ...depth to suit facing material adjustable to 1 2 5 8 or 3 4 depths Fig 4 5 Screw through slotted holes in drywall strip and then screw into pre drilled holes on replace side Meas ure from face of repl...

Страница 7: ...f any part of it has been under water Immediately call a quali ed service technician to inspect the replace and replace any part of the control which has been under water Gas Inlet Manifold Pressures...

Страница 8: ...test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use only approved ttings When using black iron pipe always provide a un...

Страница 9: ...BLUE R W1 G Y GND CHASSIS GND 24 VAC RTN 24 VAC HOT TH TP PILE TH PILE THERMOPILE GAS VALVE TP TH TP TH EMERGENCY HEAT SWITCH 14 YELLOW 15 BLUE 13 BLUE 12 YELLOW RED WHITE L1 L2 TP TH TH LIMIT 16 YELL...

Страница 10: ...3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other app...

Страница 11: ...suggest putting a lubricant Vaseline or similar on the male end of the twist lock pipe prior to assembly TWL100 Twist Lock Pipe 3 12 99 djt Male End Female End Screw Holes TWL100 Fig 11 Twist lock pip...

Страница 12: ...se applications Refer to Venting Components listed for different installation requirements The maximum horizontal distance between the rear of the appliance and the outside face of the rear wall is 20...

Страница 13: ...rmination 4 collar into the 4 pipe then the 7 collar into the 7 pipe Do not force the venting into position If the pipes do not line up with the termina tion collars disassemble elbows or pipes and re...

Страница 14: ...alled in either the vertical or horizontal run When one 1 90 elbow is installed directly onto another off the back of the replace the maximum horizontal vent length is 36 914 mm Fig 19 For each 45 elb...

Страница 15: ...4 100 Vent Opening 2 99 djt Vent Opening for Combustible Wall 9 240 mm 9 240 mm Fireplace Hearth Framing Detail Vent Opening for Noncombustible Wall 7 190 mm VO584 100 Fig 22 Locate vent opening on wa...

Страница 16: ...uirement STEP 7 Support the horizontal pipes every 36 914 mm with metal pipe straps Make sure the horizontal vent pipe is installed on a level horizontal plane STEP 8 Re check the replace to make sure...

Страница 17: ...pe Straps Every 3 914mm CFM148 Fig 30 Support straps for horizontal runs Up to two 2 45 elbows may be used within the horizontal run For each 45 elbow used on the hori zontal level the maximum horizon...

Страница 18: ...and 7 collars of vertical vent termination and install If there is a room above ceiling level restop spacers must be installed on both the bottom and the top side of the ceiling joists If an attic is...

Страница 19: ...ustable length 7TDVP3566 35 to 64 adjustable length Pipe sections for vertical or horizontal venting Model 7TDVP8 Model 7TDVP12 Model 7TDVP24 Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS At...

Страница 20: ...other airborne particles to cling to the glass surface Also initial paint curing may deposit a slight lm on the glass It is therefore recommended the glass FP1405 DVHVAC remove glass frame 8 03 Clamps...

Страница 21: ...to the ON position This will turn on the replace burner in a low re condition The unit will provide heat to the room in which the replace is installed When power is restored toggle the emergency heat...

Страница 22: ...and logs 2 Place refractory side supports so that the hole ts over the screw head on the rebox oor 3 Place refractory base sides on the oor of the re box 4 Attach adjustable tabs packed with refracto...

Страница 23: ...the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any replace Do not touch any electric switch Do not use any phone in your buildi...

Страница 24: ...An interrupter block not supplied must be used to conduct this test 3 Pilot burning no gas to A Thermostat or wires defective Check wall switch and wires for proper connections main burner Valve knob...

Страница 25: ...tem consist of burner tube gas ori ce pilot assembly thermopile millivolt gas valve Most of these components may require only an occasional checkup and cleaning and some may require adjustment If repa...

Страница 26: ...C parts 7 02 4a b 1e 1f 1d 1c 1b 1a 1195 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time without notice DVHV...

Страница 27: ...t 54273 8b Ori ce Pilot Prop 54272 9 Pilot 3 Way 10001295 10 Pilot Tubing w ttings 53211 11 Manifold Tubing w ttings 57318 12 Thermocouple 53373 13 Thermopile 51827 14 Electrode Ignitor w cable 100012...

Страница 28: ...ang bay window assembly over existing window frame assembly Do not remove existing window frame as sembly 6 Re install upper louvre assembly Remove all plastic from brass trims 7 Bottom brass trim is...

Страница 29: ...29 DVHVAC36 10001195...

Страница 30: ......

Страница 31: ...mageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered...

Страница 32: ...EnerGuide Ratings Steady State D O E Fireplace Ef ciency Fan OFF Fan ON AFUE DVHVAC36RN 76 83 84 77 1 DVHVAC36RP 76 84 85 77 1 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmc...

Отзывы: