General Glass Information

Only glass approved by Vermont Casting, 
Majestic Products should be used on this 
fireplace.

• 

The use of non-approved replacement glass will void 
all product warranties.

• 

Care must be taken to avoid breakage of the glass.

• 

Do not operate appliance with glass front 
removed, cracked or broken.

• 

Replacement of the glass (complete with gasket) 
is available through your Majestic Fireplaces 
dealer and should be done by a licensed 
qualified service person.

Louvre Removal

To remove top louvre, 
pull louvre up and 
then lift out. (Fig. 35)

1.

2.

FP1227

Louvre removal

11/02

Top Lou-
vre
Assembly

Window 

Frame As-

sembly

FP1227

Fig. 35

  Remove top louvre as-

sembly.

Window Frame Assembly Removal

1.  Shut off gas.
2.  Let the fireplace cool if it has been operating.
3.  Remove top louvre assembly. (See Louvre Removal)
4.  Open the lower louvre assembly.
5.  Release the two clamps at the bottom of the window 

frame by pulling down on the clamp handles. (Fig. 
36)

6.  Tilt window frame assembly out slightly at the bot-

tom, lift the frame up and away from the fireplace.

7.  To replace window frame assembly, reverse this 

procedure.

Glass Cleaning

It will be necessary to clean the glass periodically. 
During start-up, condensation, which is normal, forms 
on the inside of the glass and causes lint, dust and 
other airborne particles to cling to the glass surface. 
Also initial paint curing may deposit a slight film on 
the glass. It is therefore recommended the glass 

FP1405

DVHVAC

remove glass frame

8/03

Clamps

Glass 

Frame

Fireplace 

Front

Window 

Frame

Assem-

bly

Window 

Frame 

Assembly

Pull Clamp Hook

Push 

Clamp 

Handle

FP1405

Fig. 36

  Window frame assembly removal.

be cleaned two or three times with a non-ammonia 
household cleaner and warm water (we recommend 
gas fireplace glass cleaner). After that the glass should 
be cleaned two or three times during each heating 
season depending on the circumstances present.

Clean glass after first two weeks of 
operation.
Do not clean glass when it is hot.
Do not use abrasive cleaners.
Do not strike or slam the glass.

Installation of Logs & 

Burner Lava Rock Material

Refer to Figure 37.
1.  Remove window frame assembly.
2.  Remove logs from packaging.
3.  Place rear log (B15) on rear bracket (ensure log is 

seated properly, levelled and centered to the unit), 
so it will not move from side to side and it is firmly 
positioned on the bracket.

4.  Slip front ember log (B12) down in the front deflector. 
5.  Place front left log (B13) on top burner, left side. Use 

log's bottom holes to locate it into the left bracket log 
locator studs.

6.  Place front right log (B14) on top of burner, right 

side. Use log's bottom holes to locate it into the right 
bracket log locator studs.

7.  Place burner lava rock on top of burner. (Fig. 37) 

Refer to "Setting Temperature Rise".

8.  Place top right log (B17) onto locator notches. 

Ensure log is secure.

Содержание DVHVAC36

Страница 1: ...cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS...

Страница 2: ...eral Venting 9 General Venting Information Termination Location 10 General Information Assembling Vent Pipes 11 Twist Lock Pipes 11 How to Use the Vent Graph 12 Sidewall Venting Graph 12 Corner Instal...

Страница 3: ...at the gas valve and pilot light are turned off before you attempt to clean this re place 7 The venting system chimney of this replace should be checked at least once a year and if needed your venting...

Страница 4: ...ci cations Ref DVHVAC36 Ref DVHVAC36 A 36 914 mm N 9 245 mm B 34 870 mm O 6 175 mm C 21 533 mm P 2 58 mm D 33 838 mm Q 2 51 mm E 63 1621 mm R 3 97 mm F 70 1780 mm S 4 102 mm G 16 410 mm T 1 2 13 mm H...

Страница 5: ...Remove the access panel on the front of the air cir culating blower section by removing the 10 24 nuts Remove the jack plug from the air circulating blower motor by gently depressing tab 5 Attach the...

Страница 6: ...depth to suit facing material adjustable to 1 2 5 8 or 3 4 depths Fig 4 5 Screw through slotted holes in drywall strip and then screw into pre drilled holes on replace side Meas ure from face of repl...

Страница 7: ...f any part of it has been under water Immediately call a quali ed service technician to inspect the replace and replace any part of the control which has been under water Gas Inlet Manifold Pressures...

Страница 8: ...test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use only approved ttings When using black iron pipe always provide a un...

Страница 9: ...BLUE R W1 G Y GND CHASSIS GND 24 VAC RTN 24 VAC HOT TH TP PILE TH PILE THERMOPILE GAS VALVE TP TH TP TH EMERGENCY HEAT SWITCH 14 YELLOW 15 BLUE 13 BLUE 12 YELLOW RED WHITE L1 L2 TP TH TH LIMIT 16 YELL...

Страница 10: ...3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other app...

Страница 11: ...suggest putting a lubricant Vaseline or similar on the male end of the twist lock pipe prior to assembly TWL100 Twist Lock Pipe 3 12 99 djt Male End Female End Screw Holes TWL100 Fig 11 Twist lock pip...

Страница 12: ...se applications Refer to Venting Components listed for different installation requirements The maximum horizontal distance between the rear of the appliance and the outside face of the rear wall is 20...

Страница 13: ...rmination 4 collar into the 4 pipe then the 7 collar into the 7 pipe Do not force the venting into position If the pipes do not line up with the termina tion collars disassemble elbows or pipes and re...

Страница 14: ...alled in either the vertical or horizontal run When one 1 90 elbow is installed directly onto another off the back of the replace the maximum horizontal vent length is 36 914 mm Fig 19 For each 45 elb...

Страница 15: ...4 100 Vent Opening 2 99 djt Vent Opening for Combustible Wall 9 240 mm 9 240 mm Fireplace Hearth Framing Detail Vent Opening for Noncombustible Wall 7 190 mm VO584 100 Fig 22 Locate vent opening on wa...

Страница 16: ...uirement STEP 7 Support the horizontal pipes every 36 914 mm with metal pipe straps Make sure the horizontal vent pipe is installed on a level horizontal plane STEP 8 Re check the replace to make sure...

Страница 17: ...pe Straps Every 3 914mm CFM148 Fig 30 Support straps for horizontal runs Up to two 2 45 elbows may be used within the horizontal run For each 45 elbow used on the hori zontal level the maximum horizon...

Страница 18: ...and 7 collars of vertical vent termination and install If there is a room above ceiling level restop spacers must be installed on both the bottom and the top side of the ceiling joists If an attic is...

Страница 19: ...ustable length 7TDVP3566 35 to 64 adjustable length Pipe sections for vertical or horizontal venting Model 7TDVP8 Model 7TDVP12 Model 7TDVP24 Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS At...

Страница 20: ...other airborne particles to cling to the glass surface Also initial paint curing may deposit a slight lm on the glass It is therefore recommended the glass FP1405 DVHVAC remove glass frame 8 03 Clamps...

Страница 21: ...to the ON position This will turn on the replace burner in a low re condition The unit will provide heat to the room in which the replace is installed When power is restored toggle the emergency heat...

Страница 22: ...and logs 2 Place refractory side supports so that the hole ts over the screw head on the rebox oor 3 Place refractory base sides on the oor of the re box 4 Attach adjustable tabs packed with refracto...

Страница 23: ...the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any replace Do not touch any electric switch Do not use any phone in your buildi...

Страница 24: ...An interrupter block not supplied must be used to conduct this test 3 Pilot burning no gas to A Thermostat or wires defective Check wall switch and wires for proper connections main burner Valve knob...

Страница 25: ...tem consist of burner tube gas ori ce pilot assembly thermopile millivolt gas valve Most of these components may require only an occasional checkup and cleaning and some may require adjustment If repa...

Страница 26: ...C parts 7 02 4a b 1e 1f 1d 1c 1b 1a 1195 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time without notice DVHV...

Страница 27: ...t 54273 8b Ori ce Pilot Prop 54272 9 Pilot 3 Way 10001295 10 Pilot Tubing w ttings 53211 11 Manifold Tubing w ttings 57318 12 Thermocouple 53373 13 Thermopile 51827 14 Electrode Ignitor w cable 100012...

Страница 28: ...ang bay window assembly over existing window frame assembly Do not remove existing window frame as sembly 6 Re install upper louvre assembly Remove all plastic from brass trims 7 Bottom brass trim is...

Страница 29: ...29 DVHVAC36 10001195...

Страница 30: ......

Страница 31: ...mageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of this warranty is covered...

Страница 32: ...EnerGuide Ratings Steady State D O E Fireplace Ef ciency Fan OFF Fan ON AFUE DVHVAC36RN 76 83 84 77 1 DVHVAC36RP 76 84 85 77 1 410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmc...

Отзывы: