© MAHLE
Important notes | ACX2120H | 5
en
Liability
All data in this program is based—where possible—on manufac -
turer and importer details. MAHLE does not accept liability for the
correctness and completeness of software and data; liability for
damage caused by faulty software and data is ruled out. Whatever
the event, MAHLE liability is restricted to the amount for which
the customer actually pays for this product. This disclaimer of
liability does not apply to damages caused by intent or gross
negligence on the part of MAHLE.
Warranty
Any use of non-approved hardware and software will result in a
to our product and thus to exclusion of any liability
and warranty, even if the hardware or software has in the mean
time been removed or deleted.
No changes may be made to our products. Our products may
only be used in combination with original accessories and original
service parts. Failing to do so, will render null and void all war
ranty claims.
This product may only be operated using MAHLE approved
operating systems. If the product is operated using an operating
system other than the approved one, then our warranty obligation
pursuant to our supply conditions will be rendered null and void.
Furthermore, we will not be held liable for damage and conse
quential damage incurred through the use of a non-approved
operating system.
2.3
Obligation of contractor
The contractor is obliged to ensure that all measures geared
towards the prevention of accidents, industrial diseases, labor-
related health risks are taken and measures towards making
to work in are carried out.
Electrical engineering in Germany is subject to the accident
prevention regulations of the trade association "Electrical Plant
and Equipment as under BGV A3 (previously VBG 4)". In all
other countries, the applicable national regulations acts or de
crees are to be adhered to.
Basic rules
Specifications for electrical systems (BGV A3)
The contractor is bound to ensure that all electrical equipment
and operating material is set up, modified and maintained by
skilled electricians only or under the guidance and supervision
of a skilled electrician in accordance with electrical engineering
principles.
Furthermore, the contractor must ensure that all electrical equip
ment and operating material is operated in keeping with electrical
engineering principles.
If a piece of electrical equipment or operating material is found to
be defective, i.e. it does not or no longer complies with electrical
engineering principles, the contractor must ensure that the fault
is r
immediately and, in the event that imminent danger
exists, also ensure that the electrical equipment or the electrical
operating material is not used.
Tests (taking Germany as an example)
\
\
\
The contractor must ensure that all electrical systems and
equipment are tested by
electrician or under the
guidance of
electrician to ensure they are in proper
working order:
—
Before star
—
After
or repair before starting for the
time.
—
At given intervals. Set intervals such as to ensure that
faults that can be expected to occur are determined in
good time.
The test is to take the electrical engineering principles relating
hereto into account.
Upon request of the trade association, a test manual is to be
maintained into which specific entries are made.
Содержание ArcticPRO ACX2120H
Страница 1: ...EN Operation manual A C Service Equipment MAHLE ACX2120H...
Страница 39: ...MAHLE Notes ACX2120H 39 en 15 Notes...