40
The repair methods given by the manufacturer in this document are based on the technical specifications, current at the time of release. The methods may be modified as a result of changes introduced by the
manufacturer in the production of the various component units and accessories from which the vehicles are manufactured. The reproduction, translation, transmission, in part of or whole of the present document, are
prohibited without the prior written consent of Mahindra & Mahindra Ltd. The use of this document by any person other than the trained personnel, at the Authorized Service Centre of Mahindra & Mahindra Ltd., will
amount to unauthorized use and shall be liable for penalty/prosecution© 2021 Mahindra & Mahindra Ltd.
STEP 3 – CHECK UICU POWER AND GROUND CIRCUIT
PRE CONDITION
• Turn ON ignition
TEST PROCEDURE
•
Check the UICU power and ground wires
ACCEPTANCE CRITERIA
• Is the power and ground circuit of UICU is OK
ACTION TO BE TAKEN
OK
NOT OK
• Connect i-SMART and try to clear all DTC’s
• If the DTC’s not getting cleared,
Contact
TEKliner for further assistance
• If the DTC’s got cleared. Turn OFF the ignition,
wait for 2 minutes. Turn ON ignition & Check
whether the issue is resolved
• Replace or repair the wiring harness
• After replacing the wiring harness,
Check
whether
the
DTC
got
reproduced.
• If the DTC reproduced again, contact
TEKline
Diagnostic Manual
XUV700 (Diesel)
UICU
MAN-01065
OCT - 2021/Rev 1
Содержание XUV700 2021
Страница 2: ......