BA550001-en
27
4 From this step onwards, at least a second person, and if necessary other
persons, must be called in to assist with the installation work. Slide the
chassis supports sideways onto the lifting rollers (Caution: Danger of
tipping!) and secure with lashing straps. Make sure that the lashing straps
are positioned as close as possible to the lift.
5 Fasten one side panel with a round sling, lift it using lifting gear and slide it
laterally with the square pins into the chassis beams as far as it will go.
Then replace the previously removed M12 screws including washers and
tighten them hand-tight.
Align already mounted chassis components load-symmetrically on the jack,
i.e. the center of gravity (not the center!) should be aligned centrally above
the jack. Attention: Danger of tipping!
6 For the second side panel, repeat the installation procedure as described
above, see point 5. After inserting the second side part, reposition the
chassis centrally on the lift.
The jack is now centered in the chassis and can now be secured against
slipping. Two lashing straps are recommended, which are guided through
the handle openings in the carriers and enclose the lift in opposite
directions.
Содержание MPJ Series
Страница 6: ...6 BA550001 en Blank page...
Страница 13: ...BA550001 en 13 6 Technical data 6 1 Relevant pit dimensions...
Страница 29: ...BA550001 en 29 10 mm...
Страница 35: ...BA550001 en 35...
Страница 39: ...BA550001 en 39 I F H G J A E C D K B...
Страница 114: ...20 PL670000_002 de...