32
BA550001-en
1 Lower the pit jack into the pit in an upright position using suitable lifting
gear.
2 Mount the jacks on the chassis in the reverse order to that for disassembly.
Tighten the four hexagon head screws (A) to fix the pit jack with a
tightening torque of 85 ±5 Nm.
3 Reinsert the reinforcement tubes
4 Push pit jack through the entire working pit. At the widest point of the
working pit, the clearance between the roller collar and the pit profile may
be 5 mm on both sides (max. 10 mm permissible on one side).
C
Содержание MPJ Series
Страница 6: ...6 BA550001 en Blank page...
Страница 13: ...BA550001 en 13 6 Technical data 6 1 Relevant pit dimensions...
Страница 29: ...BA550001 en 29 10 mm...
Страница 35: ...BA550001 en 35...
Страница 39: ...BA550001 en 39 I F H G J A E C D K B...
Страница 114: ...20 PL670000_002 de...