Full Height Turnstile MPT-132
Index
65
Index
A
Assembly
Centering bolts ................................................ 38
Dismount centering bolts ................................ 35
Dismount locking discs ................................... 33
Fix the center column to the floor bearing ...... 38
Full height turnstile .......................................... 28
Lock unit (optional) .......................................... 38
Locking discs .................................................. 38
Removing lock unit (optional) ......................... 32
Requirements .................................................. 23
Setting the blocked position ............................ 39
Support beam ................................................. 30
Turnstile on the foundation ............................. 29
Assemby
Center column ................................................. 36
B
Base frame ......................................................... 27
C
Cage halves .................................................. 20, 28
Center column .............................................. 20, 28
Cleaning.............................................................. 54
Configuring the pedestrian barrier ...................... 46
Connection diagram
MBC-110 ......................................................... 43
Copyright protection ............................................. 9
Customer service ................................................ 11
D
Decommissioning ............................................... 62
Design ................................................................. 20
DIP switch block S1 ............................................ 47
DIP switch block S2 ............................................ 50
Disassembly ....................................................... 62
Disposal .............................................................. 62
Downloading MBC-110 software ........................ 61
Drive flange .................................................. 20, 28
Drive unit....................................................... 20, 28
E
EC Declaration of Conformity ............................. 11
EC-Declaration of Conformity ............................. 63
Electrical circuit diagram ..................................... 64
Electrical connection
Technical data ................................................. 19
Empty .................................................................. 26
Empty conduits ................................................... 24
Environmental protection .................................... 11
Error message – motor control unit MMC-120 ... 59
F
Foundation .................................................... 24, 26
Function .............................................................. 21
G
General ................................................................. 7
H
Hazard notes ...................................................... 16
Home position ..................................................... 39
I
Inputs .................................................................. 44
Inputs and outputs, customer ............................. 42
Instructed people ................................................ 13
Intended use ....................................................... 12
L
Limitation of liability ............................................... 9
Lock comb .................................................... 20, 28
M
Maintenance ....................................................... 53
Maintenance schedule ........................................ 55
Malfunction
Logic controller MBC-110................................ 56
MBC-110
Display error codes ......................................... 57
Display of software version ............................. 57
Error code table ............................................... 58
Malfunction ...................................................... 56
O
Occupational safety ...................................... 15, 16
Operating conditions ........................................... 19
Operating instructions ........................................... 7
Operating personnel
Requirements .................................................. 13
Operator's responsibility ..................................... 14
P
Performance data ............................................... 19
Personal protective equipment ........................... 15
Pictogram explanation .......................................... 8
Power supply connection terminals .................... 41
Q
Qualified electricians ........................................... 13
R
Relay outputs ...................................................... 45