Full Height Turnstile MPT-132
Assembly and installation
26
Fig. 5: Foundation plan and layout for empty conduits
1
Smooth trowel finish foundation, level and horizontal
2
Lay data cables and power cables in separate empty conduits.
Leave empty conduits approx. 50 mm above the foundation.
All power cables and data cables are to protrude at least 5 m from
the empty conduits.
3
Empty conduit D = 25 mm
4
After insertion, glue headless screws with Loctite 241 or similar re-
movable adhesive as a screw retention method.
5
Concrete foundation C25/30 with reinforced steel
6
Frost depth 800 mm