Page
12
13. ASSEMBLING AND CHECKING PROCEDURE
The Boring System 23V boring machine is packed in a large wooden box. We strongly suggest to apply a
careful and correct procedure to transport the box to the area where the boring machine will be installed.
Remove the two fixing de-
vices, which lock the ma-
chine to the pallet, placed
on the lower part of the
machine frame by un-
screwing the screws (see
figure on the left)
Now it is possible to sepa-
rate completely the ma-
chine from the packaging.
Transport and put the machine in the place selected
for working. Please be careful in doing this procedure
and follow the instructions described in chapter 10
Level the ma-
chine loosening /
tightening the
T.E. screws
placed on the
lower part of the
machine frame
(see figure on the
left).
A
B
C
D
E
F
G
H
Содержание BS 46
Страница 2: ...Page intentionally left blank...
Страница 4: ...Page intentionally left blank...
Страница 7: ...NOTES...
Страница 12: ...Page 8...
Страница 28: ...Page 24 NOTES...
Страница 32: ...26430002 FRAME GROUP...
Страница 34: ...26405001 TABLE GROUP...
Страница 36: ...26405100 PLANE GROUP...
Страница 38: ...26405104 ANGULAR REFERENCE GROUP...
Страница 40: ...Page 30 26405500 HOLD DOWN CLAMPS UNIT 00001123 BLACK SPIRAL PIPE TR 8x6...
Страница 42: ...Page 32 26054501 HOLD DOWN CLAMPS UNIT SUBGROUP...
Страница 46: ...Page 36 26401800 LONG FENCE GROUP...
Страница 56: ......