Page
21
GREASING DRILLING HEAD PROCEDURE
The greasing operation of the spindle holder head must be carried out when the unit is hot so that the grease
inside is more fluid.
1. remove the screw (A) so that there is a open hole in the head cover
2. Use EP2 type grease, insert the pump into the grease fitting (B) and add a small amount of lubricant
3. Switch on the machine and let the spindles turn so that the grease goes all around the gears in the head
4. Switch off the machine
5. Verify if some grease has leaked out of the hole (position A); if not, please, repeat the whole procedure once
again and until the grease is leaking out
6. Lock the head cover back to the head by inserting the washer and screw in place ( A )
CLEAN AND LUBRICATE GUIDES, SLIDING RODS AND MOVING SCREWS
Содержание BS 46
Страница 2: ...Page intentionally left blank...
Страница 4: ...Page intentionally left blank...
Страница 7: ...NOTES...
Страница 12: ...Page 8...
Страница 28: ...Page 24 NOTES...
Страница 32: ...26430002 FRAME GROUP...
Страница 34: ...26405001 TABLE GROUP...
Страница 36: ...26405100 PLANE GROUP...
Страница 38: ...26405104 ANGULAR REFERENCE GROUP...
Страница 40: ...Page 30 26405500 HOLD DOWN CLAMPS UNIT 00001123 BLACK SPIRAL PIPE TR 8x6...
Страница 42: ...Page 32 26054501 HOLD DOWN CLAMPS UNIT SUBGROUP...
Страница 46: ...Page 36 26401800 LONG FENCE GROUP...
Страница 56: ......