8.Download progress bar will be displayed if connected successfully, the
downloading progress takes about 10 minutes.
9.After the download is completed, turn off the power, turn the switch from
“Stop” to “Run” on PLC (marked in frame), unplug the PLC-RS232
connection cable (the cable linked with computer) and plug in the original
interface cable.
Содержание Plus II
Страница 1: ......
Страница 5: ...Specification Operating Parameters Operating Environment Applications...
Страница 6: ...IQ OQ PQDocuments IQDocuments...
Страница 7: ...OQ Documents...
Страница 8: ...PQ Documents...
Страница 9: ......
Страница 10: ...Accessories Installation 1 2 3 4 5 7 6 8 9 10 11 BeforeInstallation...
Страница 11: ...System Overview...
Страница 14: ...Installation...
Страница 15: ......
Страница 33: ...Replace Fuse Please use the specified type of fuse tominimizetheriskofburning...
Страница 35: ......
Страница 36: ...Disassemblethehousing 1 Loosen the two bottom screws to about 3mm...
Страница 37: ...2 Remove the remaining eight screws and take off the lid...
Страница 40: ...Axisdirections V axisdirection Y axisdirection M axisdirection V axisdirection X axisdirection...
Страница 42: ...ReplaceLEDlight 1 Remove the LED light from the top panel 2 Install a new LED light and hold it with cable ties...
Страница 49: ...Replace the sensor ofX axis 1 Remove the wire connected with the sensor 2 Remove the two screws on the sensor...
Страница 59: ...Replace Solid StateRelay SSR 1 Remove the two screws on SSR Remove the SSR and replace with a new one...
Страница 60: ...Electrical controlandengineeringsoftware...
Страница 61: ...Main board configuration...
Страница 66: ...10 Go to System Status and check the PLC version...
Страница 69: ...5 Go to System Status and check the HMI version...
Страница 72: ...6 Tap Confirmation when the program update is complete 7 Go to System Status and check the program version...
Страница 78: ......
Страница 79: ......
Страница 80: ......