background image

 

                                          

MAGA s.r.o., S. Kollára 86, Čerenčany  979 01, Slovak  Republic.

 

                                               +421 917 465 298, [email protected],www.magasro.sk           

Made in Slovakia

 

 

 

14 

STN 33 2000-4-41 Protection  against  electric  shock. 

STN 33 2000-5-51 Electrical  regulations.  El.  equipment.  Part 5: Construction  of power. 

devices. 

STN 33 2030 Electrotechnical  regulations.  Protection  against  dangerous  effects  of static 

electricity. 

STN 33 2130 Electrotechnical  regulations.  Internal  electrical  wiring. 

STN 33 2180 Connection  of electrical  devices  and appliances. 

SNT 33 2320 Electrical  regulations.  Regulations  for  electrical  devices  in  areas with 

danger  of explosion  of combustible  gases and  vapors 

STN 33 2350 Regulations  for electrical  equipment  in  difficult  climatic  conditions. 

STN EN 60335-1 Safety  of electrical  appliances  for  household  and similar  purposes. 

 

5.2 BOILER  PLACEMENT 

The location of the boiler  regarding to fire regulations 

Placing  on the floor  from  combustible  material 

 

 boiler  on a fireproof  thermal  insulation  pad exceeding  boiler  on the sides  of  20 

mm. 

 

 if  the boiler  is located  in  the  cellar,  we recommend  placing  it  on concrete  slabs 

min.  50 mm  high.  The  boiler  must  stand horizontally. 

Safety distance from  combustible  materials 

 

When  installing  and operating  the  boiler  it  is  necessary  to keep a safety  distance 

of 200 mm  from  flammable  materials  of  flammability  B, C, and D (according  to 

EN 13501-1) (Table  3) 

 

for  easily  flammable  substances  degree  E, F, which  burn  quickly  and by 

themselves  also  after  the  ignition  source removal  (eg. Paper, paperboard, 

cardboard, asphalt  and tar boards, wood and fibreboards,  plastics,  flooring 

materials)  the  safe distance  is doubled  ie.  to 400 mm 

 

safe  distance  is  to be doubled  also  in  case when  the flammability  level  of the 

building  material  is not  proved 

 

Tab  3

 Flammability  levels  of  building  materials  and products 

Flammability  of 

Constructing  materials 

and  products 

Constructing  materials  and  productsaccordingflammability 

degree (selection of EN 13501-1) 

 

A1 - non-combustible 

granite,  sandstone,  concrete,  bricks,  ceramic  tiles,  mortars,  fire 

plasters,  ...... 

A2 - hardly  flammable 

acumin,  izumin,,  Lignos,  boards and basalt  felt,  glass  fiber  boards, ..... 

 

B - hardly  combustible 

Beech  and oak wood, OSB, plywood,  formica,  sirkolit,  .... 

C, D - medium 

pine,  chipboard  and cork boards, rubber  flooring,  ....... 

Содержание DP25 PREMIUM

Страница 1: ...RATION OF MAGA PELLET AND WOOD BOILER DP25 PREMIUM Fig 1 MAGA DP25 PREMIUM Dear customer thank you for the purchasing of our product Please follow the manual in order to be 100 satisfied with its oper...

Страница 2: ...ATIONS 13 5 2 BOILER PLACEMENT 14 6 STARTUP INSTRUCTIONS FOR CONTRACTUAL SERVICE ORGANIZATION 18 6 1 BEFORE START CHECK 18 6 2 FIRST BOILER OPERATION AND OPERATOR TRAINING 19 6 3 BOILER OPERATION 20 7...

Страница 3: ...for connection to external control room thermostat equithermic regulation including control of the circulating pump MAGA DP 25 solid fuel boilers are designed for combustion of wood wood briquettes in...

Страница 4: ...e remote room control EcoSTER 200 boiler operation without the need for physical presence in the boiler room 3 Water accumulation tank buffer of min volume 800 litres Please make sure your boiler set...

Страница 5: ...nburned fuel residues fall through into the ash collector at the bottom of the chamber Automatically operated pellet burner controls the air intake fuel intensity of burning ignition and extinction ac...

Страница 6: ...163 F mm 1220 G mm 1145 H mm 285 Power nominal pellet kW 17 or 27 Max Power pellet kW 20 27 Upper fuel chamber capacity l 65 Operational chimney flow Pa 15 20 Max Operational water pressure MPa 0 2 Bo...

Страница 7: ...arts need to be connected in the numeric order according the figure 7 Parts with the same numbers need to be completed at on time 6 6 9 9 Put the cover on the top after feeding the silo with pellets P...

Страница 8: ...8 Fig 3 Assembly of pellet feeder 1 oven tray 2 nut 3 screw 4 spring 5 bolt 6 screw 7 rod 8 screw 9 Gearbox with engine motor For proper operation of the feeder must be inserted through the opening to...

Страница 9: ...llet burner need to be pushed into the boiler door and fitted by enclosed screws To the top of the burner need to be connected with the tube of the feeder This have to be done with all the types of bu...

Страница 10: ...l feeder and ventilator parameters for the setback mode Operation of feeder and fan hand The flow temperature of the circulating pump Central heating The storage tank Control pumps for hot The control...

Страница 11: ...ondition and an interruption of the fuel supply to the burner Photosensor The photosensors monitors the flame intensity in the combustion chamber In the event of a decrease in light intensity the burn...

Страница 12: ...7 465 298 servis magasro sk www magasro sk Made in Slovakia 12 STB fuse protects a controller against high voltage and short curcuit It consists of a tubular glass fuse STB 3 15 A which after melting...

Страница 13: ...m STN 06 0310 central heating designing and assembly STN 06 0830 Safety set up for central heating and hot water STN 07 7401 Water and steam for thermal energy facilities with a working pressure up to...

Страница 14: ...ler is located in the cellar we recommend placing it on concrete slabs min 50 mm high The boiler must stand horizontally Safety distance from combustible materials When installing and operating the bo...

Страница 15: ...ler is connected to power Fixed network attached corded completed a standardized plug Protection against electric shock must be ensured in accordance with the applicable EN STN see Sec 1 4 Location of...

Страница 16: ...MAGA s r o S Koll ra 86 eren any 979 01 Slovak Republic 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 16 Fig 10 Boiler placement in the boiler room space...

Страница 17: ...supply terminated by a standardized fork Protection against electric shock has to be ensured according to current STN EN see chapter 4 1 Fuel location For proper combustion in the boiler it is necess...

Страница 18: ...of the exchanger Precipitation of 1 mm calcite reduces at a given place the heat transfer from the metal to water by 10 Heating systems with an open expansion tank allow direct contact of heating wat...

Страница 19: ...ug into an electrical socket leave it running for approx 10 minutes if the conveyor is not filled and the pellets do not start to fall over the hose 5 Perform calibration of the fuel feeder and set pa...

Страница 20: ...in operation is not permitted If there is a danger of penetration of combustible vapors or gases into the boiler room or at works where there is a risk of fire or explosion gluing the floorings paint...

Страница 21: ...em it is only added to the cooled boiler to avoid damaging the steel heat exchanger Check the boiler before starting up the boiler A The tightness of the heating system B Connection to the chimney mus...

Страница 22: ...he weight of the burned pellets when the boiler control is set correctly when the combustion process is optimal For less efficient combustion the amount of ash produced increases proportionally Follow...

Страница 23: ...lean the heat exchanger tubes using a rounded poke and brush 4 After cleaning insert the turbulators back put on the steel cover and then install the top cover Ashtray Spill out the ash regularly Ash...

Страница 24: ...s For this purpose it is necessary to remove the cover by loosening in models of four screws Then remove the photosensor from the socket clean and reassemble After performing the above operations the...

Страница 25: ...ion tube of the burner from the crush and ash at the beginning of each day and then once in a while After removing the burner remove the ash and debris residue with the best wire brush or small knife...

Страница 26: ...er and burner temperature sensors Checking and cleaning the flame sensor Check flap state with counterbalance if any Recording the status of service counters Cleaning the jet nozzles and the burner bu...

Страница 27: ...st be responsible The first initial start and installation of the burner must be performed by an authorized service technician The service technician will fill in the Letter of Guarantee within this M...

Страница 28: ...CE LIFE Please kindly take into account that the productis made of conventional metallic materials therefore it is recommended to disposeits individual parts as follows Boiler body cladding recycling...

Страница 29: ...ammable liquids Possible flame observation during boiler operation is by opening the door Opening the door during operation is prohibited When operating the boiler it is necessary to have a carefully...

Страница 30: ...security efficiency we draw attention to the possible emergence of certain residual risks that can not be eliminated by any technical solution Electrical risks The connection maintenance of the repai...

Страница 31: ...combusted in the boiler I forbid storage of flammable liquids near the boiler Take full attention to the risk of burning when operating the boiler Risks due to fuel handling When handling from fuel pa...

Страница 32: ...sidues Therefore the extinguishing process must be carried out before turning off the power supply of the burner In case of more serious faults contact the installer The burner does not ignite the fue...

Страница 33: ...ting of the internal feeder towards the outside Increase the time of the internal feeder service menu burner feeder Transmission Damage Transmission Replacement Incorrectly selected service interval v...

Страница 34: ...is magasro sk www magasro sk Made in Slovakia 34 13 WARRANTY AND GUARANTEE Warranty and after warranty reparations are made by Manufacturer MAGA s r o S Koll ra 86 979 01 eren any Slovak Republic Tel...

Страница 35: ...303 5 2012 Product Serial number Production date Stamp and signature of the producer Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarant...

Страница 36: ...or supplier as well as defects caused by the accidental or intentional penetration of liquid insects animals or foreign objects into the product s body 4 Should a component fail this component will be...

Страница 37: ...y with the instructions for use improperly executed assembly resulting in malfunctioning of the product or reduced performance are covered by the end user of the product Rights of Product Liability fo...

Страница 38: ...c 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 38 RECORD OF GUARANTEE REPAIRS Record of performed repairs within and after guarantee period Date of the record Performed activity O...

Отзывы: