background image

 

                                          

MAGA s.r.o., S. Kollára 86, Čerenčany  979 01, Slovak  Republic.

 

                                               +421 917 465 298, [email protected],www.magasro.sk           

Made in Slovakia

 

 

 

17 

 

The  boiler  is  placed: 
• Basic  environment  AA5 / AB5 according  to STN 33 2000-3 
• Before  the  boiler,  the  min.  1000 mm 
• The minimum  distance  between  the back of  the boiler  and the wall  is 400 mm 
• at the  fuel  tank side  a gap of  min.  500 mm  in  case of  removal  of the  feeding  screw 
• Minimum  distance  from  the  left  sidewall  100 mm 
• above the boiler  at least  450 mm  for the  possibility  of  cleaning  the  exchanger  and 
filling  the  fuel 
 

Location  of the boiler  to the electricity grid

 

The  boiler  must  be positioned  so that  the  plug  in  the socket (230V/50Hz)  is always 
accessible.  The  boiler  connects  to the el.   network  with  a rigidly  connected  movable 
supply  terminated  by a standardized  fork 
Protection  against  electric  shock  has to be ensured  according  to current  STN EN (see 
chapter  4.1). 
 

Fuel location

 

For proper combustion  in  the  boiler  it  is  necessary  to use  dry fuel.  Pellets  are 
recommended  to be stored in  their  original  packaging  by the manufacturer  (PET bags) 
in  a dry place.  Fuel  is  forbidden  to stow the boiler,  store it  next  to the boiler  at a 
distance  of  less  than  400 mm.  The  manufacturer  recommends  that  the  distance  between 
the  boiler  and the  fuel  min.  1 000 mm  or place the  fuel  in  a different  room than  the 
boiler  installed 
 
The  room  where  the boiler  is installed  must  have  a permanent  supply  and exhaust  for 
combustion  and ventilation.  The  connection  of  the heating  system  pipe or DHW heater 
piping  must  be carried  out by an authorized  person. 
 

  

When  connecting  the boiler  to the heating system, the drain  valve must  be 

located in the lowest position  and as closest to the boiler  as possible.

 

 

Содержание DP25 PREMIUM

Страница 1: ...RATION OF MAGA PELLET AND WOOD BOILER DP25 PREMIUM Fig 1 MAGA DP25 PREMIUM Dear customer thank you for the purchasing of our product Please follow the manual in order to be 100 satisfied with its oper...

Страница 2: ...ATIONS 13 5 2 BOILER PLACEMENT 14 6 STARTUP INSTRUCTIONS FOR CONTRACTUAL SERVICE ORGANIZATION 18 6 1 BEFORE START CHECK 18 6 2 FIRST BOILER OPERATION AND OPERATOR TRAINING 19 6 3 BOILER OPERATION 20 7...

Страница 3: ...for connection to external control room thermostat equithermic regulation including control of the circulating pump MAGA DP 25 solid fuel boilers are designed for combustion of wood wood briquettes in...

Страница 4: ...e remote room control EcoSTER 200 boiler operation without the need for physical presence in the boiler room 3 Water accumulation tank buffer of min volume 800 litres Please make sure your boiler set...

Страница 5: ...nburned fuel residues fall through into the ash collector at the bottom of the chamber Automatically operated pellet burner controls the air intake fuel intensity of burning ignition and extinction ac...

Страница 6: ...163 F mm 1220 G mm 1145 H mm 285 Power nominal pellet kW 17 or 27 Max Power pellet kW 20 27 Upper fuel chamber capacity l 65 Operational chimney flow Pa 15 20 Max Operational water pressure MPa 0 2 Bo...

Страница 7: ...arts need to be connected in the numeric order according the figure 7 Parts with the same numbers need to be completed at on time 6 6 9 9 Put the cover on the top after feeding the silo with pellets P...

Страница 8: ...8 Fig 3 Assembly of pellet feeder 1 oven tray 2 nut 3 screw 4 spring 5 bolt 6 screw 7 rod 8 screw 9 Gearbox with engine motor For proper operation of the feeder must be inserted through the opening to...

Страница 9: ...llet burner need to be pushed into the boiler door and fitted by enclosed screws To the top of the burner need to be connected with the tube of the feeder This have to be done with all the types of bu...

Страница 10: ...l feeder and ventilator parameters for the setback mode Operation of feeder and fan hand The flow temperature of the circulating pump Central heating The storage tank Control pumps for hot The control...

Страница 11: ...ondition and an interruption of the fuel supply to the burner Photosensor The photosensors monitors the flame intensity in the combustion chamber In the event of a decrease in light intensity the burn...

Страница 12: ...7 465 298 servis magasro sk www magasro sk Made in Slovakia 12 STB fuse protects a controller against high voltage and short curcuit It consists of a tubular glass fuse STB 3 15 A which after melting...

Страница 13: ...m STN 06 0310 central heating designing and assembly STN 06 0830 Safety set up for central heating and hot water STN 07 7401 Water and steam for thermal energy facilities with a working pressure up to...

Страница 14: ...ler is located in the cellar we recommend placing it on concrete slabs min 50 mm high The boiler must stand horizontally Safety distance from combustible materials When installing and operating the bo...

Страница 15: ...ler is connected to power Fixed network attached corded completed a standardized plug Protection against electric shock must be ensured in accordance with the applicable EN STN see Sec 1 4 Location of...

Страница 16: ...MAGA s r o S Koll ra 86 eren any 979 01 Slovak Republic 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 16 Fig 10 Boiler placement in the boiler room space...

Страница 17: ...supply terminated by a standardized fork Protection against electric shock has to be ensured according to current STN EN see chapter 4 1 Fuel location For proper combustion in the boiler it is necess...

Страница 18: ...of the exchanger Precipitation of 1 mm calcite reduces at a given place the heat transfer from the metal to water by 10 Heating systems with an open expansion tank allow direct contact of heating wat...

Страница 19: ...ug into an electrical socket leave it running for approx 10 minutes if the conveyor is not filled and the pellets do not start to fall over the hose 5 Perform calibration of the fuel feeder and set pa...

Страница 20: ...in operation is not permitted If there is a danger of penetration of combustible vapors or gases into the boiler room or at works where there is a risk of fire or explosion gluing the floorings paint...

Страница 21: ...em it is only added to the cooled boiler to avoid damaging the steel heat exchanger Check the boiler before starting up the boiler A The tightness of the heating system B Connection to the chimney mus...

Страница 22: ...he weight of the burned pellets when the boiler control is set correctly when the combustion process is optimal For less efficient combustion the amount of ash produced increases proportionally Follow...

Страница 23: ...lean the heat exchanger tubes using a rounded poke and brush 4 After cleaning insert the turbulators back put on the steel cover and then install the top cover Ashtray Spill out the ash regularly Ash...

Страница 24: ...s For this purpose it is necessary to remove the cover by loosening in models of four screws Then remove the photosensor from the socket clean and reassemble After performing the above operations the...

Страница 25: ...ion tube of the burner from the crush and ash at the beginning of each day and then once in a while After removing the burner remove the ash and debris residue with the best wire brush or small knife...

Страница 26: ...er and burner temperature sensors Checking and cleaning the flame sensor Check flap state with counterbalance if any Recording the status of service counters Cleaning the jet nozzles and the burner bu...

Страница 27: ...st be responsible The first initial start and installation of the burner must be performed by an authorized service technician The service technician will fill in the Letter of Guarantee within this M...

Страница 28: ...CE LIFE Please kindly take into account that the productis made of conventional metallic materials therefore it is recommended to disposeits individual parts as follows Boiler body cladding recycling...

Страница 29: ...ammable liquids Possible flame observation during boiler operation is by opening the door Opening the door during operation is prohibited When operating the boiler it is necessary to have a carefully...

Страница 30: ...security efficiency we draw attention to the possible emergence of certain residual risks that can not be eliminated by any technical solution Electrical risks The connection maintenance of the repai...

Страница 31: ...combusted in the boiler I forbid storage of flammable liquids near the boiler Take full attention to the risk of burning when operating the boiler Risks due to fuel handling When handling from fuel pa...

Страница 32: ...sidues Therefore the extinguishing process must be carried out before turning off the power supply of the burner In case of more serious faults contact the installer The burner does not ignite the fue...

Страница 33: ...ting of the internal feeder towards the outside Increase the time of the internal feeder service menu burner feeder Transmission Damage Transmission Replacement Incorrectly selected service interval v...

Страница 34: ...is magasro sk www magasro sk Made in Slovakia 34 13 WARRANTY AND GUARANTEE Warranty and after warranty reparations are made by Manufacturer MAGA s r o S Koll ra 86 979 01 eren any Slovak Republic Tel...

Страница 35: ...303 5 2012 Product Serial number Production date Stamp and signature of the producer Date of sale Stamp and signature of the seller Date of putting into operation Stamp and signature Letter of guarant...

Страница 36: ...or supplier as well as defects caused by the accidental or intentional penetration of liquid insects animals or foreign objects into the product s body 4 Should a component fail this component will be...

Страница 37: ...y with the instructions for use improperly executed assembly resulting in malfunctioning of the product or reduced performance are covered by the end user of the product Rights of Product Liability fo...

Страница 38: ...c 421 917 465 298 servis magasro sk www magasro sk Made in Slovakia 38 RECORD OF GUARANTEE REPAIRS Record of performed repairs within and after guarantee period Date of the record Performed activity O...

Отзывы: