MacDonald Steel Limited HDP Deluxe DFC4 Скачать руководство пользователя страница 26

MacDonald Steel Limited 

BREWERY SYSTEMS DIVISION 

 

 

 

 

 

26 

REV 00 

 
 
 

TROUBLESHOOTING - Messages

 

 

The following is a list of the messages that may appear on the main screen indicating a fault or 
failure to complete a fill cycle. 

 

Head Bridged

 

A bridge occurs when liquid or foam is between the fill tube and vent tube in the filling head while 
the head is in the up position. The PLC is unable to detect a level when this occurs as it relies on 
the gap between these two tubes to determine when the bottle is filled to the proper level.  When 
a bridge is sensed while the head is up, the Co2 valve is opened to try and blow the bridge clear.  
If the bridge is cleared that head will then lower and the fill cycle continues.  The maximum time 
the Co2 valve tries to clear the bridge is determined by the setting of the "

Purge Time

" as set on 

the "

EZ Setup Menu

" screen.  If bridging occurs and will not clear automatically, use the "

Purge

button  on  the  main  screen  to  try  and  clear  the  bridge.    Be  sure  to  purge  all  fill  heads  after  any 
rinsing or washing cycle.  Sometimes drying the head with a hair dryer or heat gun will help.  Be 
careful not to get the head too hot.  If the bridge cannot be cleared, turn off the "

Auto Level

" on 

the  "

EZ Setup  Menu

" screen and use the "

Stop

" button for that particular  head  to stop the beer 

valve at the proper level.  The fill head may have to be replaced, contact MacDonald Steel. 

 
 

Failed Co2 set point

  

Co2  counter  pressures  the  bottle  to  reach  the  set  point  on  the  pressure  switch.  The  set  point 
value  is  displayed  on  the  bottom  of  the  pressure  screen  when  the  Co2  valve  is  opened.  This 
message appears if the set point is not reached within this time(max time as set in "

Purge Time"

).  

Possible  causes  are  Co2  regulator  set  too  low,  broken  or  missing  bottle,  defective  Co2  valve, 
poor  seal  at  fill  head,  leaks  in  fill  lines  or  defective  pressure  transducer.  Check  the  gauges  and 
the supply to the machine.  

 

  

Failed Vacuum Set point 

Vacuum  is  drawn  immediately  after  the  Co2  purge  and  has  to  reach  the  set  point  as  entered  in 
the pressure switch setup.  This message appears if the set point is not reached within this time  
(max time as set in "

Purge Time"

),  Possible causes are main air regulator set too low, broken or 

missing bottle, defective vacuum valve or vacuum venturi, poor seal at fill head, leaks in fill lines 
or defective pressure transducer. Check the gauges and the supply to the machine.  

 

 

Pressure Loss in Bottle 

This  message  appears  if  the  pressure  in  the  bottle  drops  to  the  "

Head  Lift

"  setting  as  per  the 

Pressure  Switch  set  up  before  a  proper  level  has  been  reached.    The  head  raises  and  bottle 
shuttles forward without crowning.  Possible causes are the flow control valve is set too high and 
the supply of product to the machine cannot be maintained, leaks in the fill lines insufficient size 
of product line to the machine or loss of pressure in the supply line.  Try reducing the flow control 
valve  by  turning  clockwise,  increase  the  size  of  the  product  line  to  the  machine  and  check  the 
pressure in the tank. 

 

 

Head Shorted Before Fill 

If this message appears the fill head was bridged just before the beer valve opened but after the 
purge and counter pressure cycles.  Try purging the head with Co2. 

 

 

Door Prox Fault 

The proximity switch on the door cylinder is not being detected.  If the heads do not lower the 
switch must be checked and adjusted or replaced.  If the machine cycles then the timing of the 
shuttles or door is too slow and the flow control on the cylinders must be adjusted. 
 

Содержание HDP Deluxe DFC4

Страница 1: ...MacDonald Steel Limited BREWERY SYSTEMS DIVISION 1 REV 00 DELUXE FILLER CROWNER MODEL DFC4...

Страница 2: ...ES DO NOT HOSE OR SPRAY THE FRONT PANEL NEVER PLACE HANDS OR OTHER OBJECTS INTO MACHINE WHILE DOOR IS OPERATING DO NOT LIFT DOOR DURING CYCLE BEFORE SERVICING DISCONNECT AIR C02 BEER AND POWER WEAR SA...

Страница 3: ...n for setup cleaning and troubleshooting Adapters are available for filling cans and various size bottles Fill from top nozzles available as an alternative to fill from bottom OPERATING REQUIREMENTS C...

Страница 4: ...e for each head these switches control the pressure for the Co2 pressure and the vacuum draw VENT CONTROL Stainless steel flow controls one for each head located at the lower left side of the machine...

Страница 5: ...this is without bottles in place and to scroll through the various functions as described below To change values such as crown time the number of purge cycles CIP times etc when the appropriate screen...

Страница 6: ...Donald Steel Limited BREWERY SYSTEMS DIVISION 6 REV 00 MACHINE SETUP After unpacking the machine the Co2 fitting fill tubes and drain fittings must be attached Installing the air regulator Co2 connect...

Страница 7: ...machine which is used to connect the beer manifold and the Co2 line together for cleaning CIP The tee fitting on the jumper has been left blank attach an appropriate connector to it depending on the...

Страница 8: ...he heads operate slowly The fill tubes are threaded on one end Carefully screw the tube onto the head Align the tube by slightly bending them if necessary to be centered in the bottle opening If neces...

Страница 9: ...ase small bottle large bottle HEAD TULIPS The filling head has a removable tulip which is used to center and seal the bottle The tulip is comprised of three parts an upper piece which seals against th...

Страница 10: ...e is pressed into the fill head and a very small amount of 2 part epoxy is applied to seal and hold in place This tube is not designed to be removed The vent tube can be removed by following the instr...

Страница 11: ...ew Once the locknut is loose back off the set screw holding the vent tube in place Twist and pull down on the tube to remove it from the filling head Insert the new vent tube into the head and tighten...

Страница 12: ...increase flow but do not allow foaming during filling Flow controls on the DFC4 NOTE During CIP mode open these controls fully C C W to allow maximum flow of cleaning solutions and rinse water DRAIN...

Страница 13: ...door cylinder proximity switch is opposite PROXIMITY REED SWITCHES There are reed switches mounted on the air cylinders for door closed head up shuttle forward and back These switches close when the c...

Страница 14: ...e of the head Use the Manual Control menu to manually operate the crowning heads Reduce the air pressure to 5 PSI or less so the heads operate slowly With the head in the down position use a large wre...

Страница 15: ...further into the head and results in a tighter crown If adjusted too deep the bottles will stick in the crowning head Only make adjustments in small increments at a time Adjusting the Crown 1 Loosen t...

Страница 16: ...roximity switches Also the number of fills per head and the total fills is recorded To enter this mode press the Manual Control On button Once in this mode no other operations are possible A message o...

Страница 17: ...s changes the value for zero There is a limit hard coded into the computer for this calibration value If you cannot zero the pressure switch using these buttons the pressure transducer is defective an...

Страница 18: ...while operating the crowners manually Cycle Fill Time These timers show the current cycle and fill times and are only used for comparing and maximizing cycle times Stop Buttons The Stop buttons are us...

Страница 19: ...n detected By increasing the delay time the fill height in the bottle can be increased The amount of increase is determined by the flow rate as this is a timer CAUTION Too much delay time will cause p...

Страница 20: ...r vacuum set point to be reached It is also used as a timer to clear a bridge prior to the purge cycle If the set point cannot be achieved during this time the cycle aborts and the head returns to the...

Страница 21: ...sure in the bottle is equal to the open psi setting the valve opens allowing product to flow into the bottle To check the tank pressure a bottle or can must be placed in the left hand 1 filling statio...

Страница 22: ...sure set point for proper fobbing When bottles fill to proper level and fob turn on the auto crown Slowly open the flow controls until maximum flow is achieved without foaming When setting up the mach...

Страница 23: ...for a quick rinse of the beer pathway It is not to be used as the main CIP cycle for cleaning the machine The Wash cycle is for a complete CIP of the machine The jumper between the beer manifold and t...

Страница 24: ...ition Place bottles on shuttles Select CIP on display menu Set a wash time between 1 to 30 minutes Push the Wash button on the screen Follow on screen instructions for starting canceling or exiting th...

Страница 25: ...hich inputs and outputs are open or closed on the PLC without having to remove the back cover Also shown are the Co2 Vacuum and Level set points This information is used to determine if certain steps...

Страница 26: ...this time max time as set in Purge Time Possible causes are Co2 regulator set too low broken or missing bottle defective Co2 valve poor seal at fill head leaks in fill lines or defective pressure tran...

Страница 27: ...r the wiring at the fill head breaks the level detection will not function To test the level sensor remove the teflon filling tube from the fill head by unscrewing it remove the bottle from the shuttl...

Страница 28: ...MacDonald Steel Limited BREWERY SYSTEMS DIVISION 28 REV 00 Back view of filler showing location of valves Product Valves Vacuum Valves C02 Valves Vent Valves...

Страница 29: ...ALL CLEANING SOLUTIONS ACCORDING TO MANUFACTURER S INSTRUCTIONS AND WEAR PROTECTIVE EQUIPMENT AS REQUIRED NEVER PLACE HANDS OR OTHER OBJECTS INTO MACHINE WHILE DOOR IS OPERATING DO NOT LIFT DOOR DURI...

Отзывы: