215620
33
Revision A
$
$
$
Figure 2.20: Shipping Wire Locations
5.
On the rear and right sides of the machine, cut remaining
shipping wires (A) securing the railings and hydraulic hoses.
$
%
&
Figure 2.21: Shipping Strap
6.
On the left side of the machine, remove bolt (A) securing
strap (B) to the horizontal shipping brace. Loosen bolt (C)
and rotate the strap away from the brace.
$
%
&
Figure 2.22: Lifting Points
7.
With the lifting device positioned behind the windrower,
secure the fuel tank assembly to the lifting device with
three chains as follows:
IMPORTANT:
To avoid damaging windrower, make sure the load is
balanced.
a.
Attach a 147 cm (58 in.) chain (A) to the right lifting
point on the fuel tank shipping assembly.
NOTE:
Avoid snagging the fuel filler neck with the chain.
b.
Attach a 145 cm (57 in.) chain (B) to the left lifting
point on the fuel tank shipping assembly.
c.
Attach a 189 cm (74.5 in.) chain (C) to the left front
lifting point on the fuel tank shipping assembly.