MacDon Industries Ltd.
680 Moray Street, Winnipeg, Manitoba, Canada R3J 3S3
T. (204) 885-5590 f. (204) 895-9146 www.macdon.com
215037
14
Revision B
U&A, Dealer
– C Series
ii.
For folding headers, ensure flighting pitch is 22” (560 mm) or less at pivot (Figure 18, red
arrow). The center auger flighting should lag the wing auger flighting to avoid binding of
material flow. Adjust auger drive dog on wing to correct timing if needed. See operator’s
manual for further detail.
m.
Check lighting and confirm proper operation.
n.
Inspect header for loose hardware, missing parts, etc.
o.
Place all tools from wooden crate and gathering chain adjustment tool in header toolbox (Figure 19).
13.
PDI Checklist
a.
Please verify using the checkboxes below (Table 1) that the corn head is properly set up before
delivering to customer.
Figure 19: Tools stored in header toolbox.
Figure 18: Center bearing support auger (w/paddles), left, and folding auger wing timing, right.