GAS SUPPLY TO SIDE BURNER OR SECOND
BURNER (YELLOW)
220V
NEARBOX
Connection Gas 1/2” (provide tap)
8
Instructions for installation and use TRUE VISION Gas
Opening provided in wall
for maintenance
Cable to ionistation pin
GAS SUPPLY TO MAIN BURNER ( RED)
flexible for GAS
True Vision is provided with
a direct ignition , no starting
pilot
3.1.3 The Gas connection
Valve 1/2”
After the “NEARBOX” has removed from the of the back of the fire, you can place it loosely on the
ground in proximity to the opening provided in the wall of mantelpiece. The device is always con-
nected with an approved gas tap 1/2, and preferably with a yellow gasflexible that is reachable at all
times. Provide the mantelpiece with a door so that the valve and the electrical connection is easily
accessible.
Содержание LUNA Series
Страница 19: ...19 7 8 9 10 11 Block 7 Block 9 Block 8 Block 10 Block 11 Instructions for installation and use TRUE VISION Gas ...
Страница 31: ...31 Instructions for installation and use TRUE VISION Gas 13 CE Certification ...
Страница 32: ...32 Instructions for installation and use TRUE VISION Gas ...
Страница 33: ...33 Instructions for installation and use TRUE VISION Gas ...