background image

4 |

P a g e

Safety Considerations

Although your UV system has been manufactured to the highest safety standards, care must be 

followed when operating and/or maintaining your system.

1.  Before servicing this equipment, disconnect the power cord from the electrical outlet.

2.  Energy given off by the UV lamp is harmful to your eyes and skin. NEVER look directly 

at an illuminated UV lamp without adequate eye protection and always protect your skin 

from direct exposure to the UV light.

3.  For complete disinfection, use ONLY genuine replacement parts.

4.  Do not operate the unit if it has any damaged or missing components.

5.  To avoid possible electrical shock, use only with a properly grounded electrical outlet.

6.  Never perform any maintenance to the system unless you are comfortable in doing so. 

Contact the manufacturer for service instructions if required.

7.  Do not use this system for any purpose other than what it was intended for. Misuse of this 

system could potentially cause harm to the user or others.

8.  Your system is intended to be installed indoors and away from leaking plumbing. DO NOT 

plug the unit in if the system or any of the components are wet.

9.  The disinfection system should be directly installed into a ground fault circuit interrupter 

(GFCI). If the use of an extension cord is required, the cord must be manufactured with a 

minimum of 16 gauge wire and care should be taken to avoid potential tripping hazards.

10. We recommend that a licensed plumber or certified technician install the system.

Before You Begin

The following will be needed for installing the UV system:

Tools

•  Pipe cutter, hacksaw or other specialized tools required to cut into your existing plumb-

ing (e.g. if you have PEX piping)

•  Soldering tools (torch, flux, emery cloth and solder)

•  Wrench (for tightening fittings)

Other Materials

•  Inlet/outlet connections

•  Teflon™ tape

Содержание BLACKCOMB LB5-Z12-2

Страница 1: ...tions LUMINOR Rack Mount Systems System Rated Flow Sediment Carbon LB4 Z1 LB5 Z1 8 gpm YES 10 NO LB4 Z2 LB5 Z2 8 gpm YES 20 NO LB4 Z12 LB5 Z12 8 gpm YES 10 YES 20 LBH4 Z2 LBH5 Z2 15 gpm YES 20 NO LBH4...

Страница 2: ...pply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is chemical free p...

Страница 3: ...1 BLACKCOMB6 1 Controllers 14 BLACKCOMB5 1 BLACKCOMB6 1 Power up Sequence 14 BLACKCOMB5 1 Operational Screens 15 BLACKCOMB6 1 Operational Screens 16 Lamp Countdown Sequence 16 System Service Suggested...

Страница 4: ...vice instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or others 8 Your system is int...

Страница 5: ...required will depend on parameters being treated Hardness 7 gpg 120 mg L if hardness level is 7 gpg or slightly below the quartz sleeve must be cleaned periodically in order to ensure effi cient UV p...

Страница 6: ...OMB rack mount UV system is designed as a do it yourself DIY system with a single inlet and outlet port Unpack the system and ensure all the components are included in the box Your system is shipped w...

Страница 7: ...s until the pump stops This is known as the cycle time 4 Then using a container of known volume preferably in US Gallons open the faucet or tap nearest the pressure system and measure the amount of wa...

Страница 8: ...ng plate 4 screws for a single filter model and 8 screws for a double filter model Step 3 Carefully lower the filter head or heads from the rack assembly and rotate 180 de grees Reassemble onto the ra...

Страница 9: ...idue on the sleeve and lamp which can ultimately block the UV light from getting to the water Carefully slide the sleeve into the reactor until you can feel it hit the opposite end of the reactor Alig...

Страница 10: ...the system The most common leak is from the o ring not making a proper seal on the reactor For new installations review steps 6 and 7 For older systems drain the reactor remove the o ring dry it and r...

Страница 11: ...land nut and turn the connector approximately turn to lock the connector to the gland nut as in Figure 10 Figure 9 Lamp Key Installation Figure 10 LUMI Loc Connector Step 14 Tighten the captive ground...

Страница 12: ...y require periodic cleaning At a minimum the quartz sleeve should be cleaned on an annual basis The following steps outline a basic clean ing procedure Step 1 If a by pass assembly is installed shut t...

Страница 13: ...slowly out of the sensor port Step 6 Holding the sensor in your hand wipe the flat portion sensor face of the sensor with isopropyl alcohol using a clean lint free cloth Step 7 Replace sensor followin...

Страница 14: ...ystem s performance in addition to pro viding any applicable fault messages and system diagnostics The controllers used in both the BLACKCOMB5 1 and BLACK COMB6 1 are identical The difference is that...

Страница 15: ...reens by pressing the button located on the front of the controller BLACKCOMB6 1 Operational Screens On systems with the UV monitor the system will display the same screens as on the BLACK COMB5 1 exc...

Страница 16: ...dible chirp Past the zero day threshold the LED or display screen changes to solid red with a continuous buzzer BLACKCOMB6 1 BLACKCOMB5 1 BLACKCOMB4 1 At any point during this sequence the audible chi...

Страница 17: ...stems After the lamp is expired it must be replaced with the same part number as indicated on the Maintenance Parts screen or on the label on the reactor With the system powered down re move and disca...

Страница 18: ...n the reactor or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleeve and sensor Check water quality meets requirements on page 5 and add filtration as required Replace...

Страница 19: ...extreme situations elevated water temperature or the fluctuation in temperature can lower the output of the UV lamp In these cases or if the elevated water temperature is a nuisance LUMINOR recommends...

Страница 20: ...rating is 240VAC 50 60Hz 30VDC 2A On a non monitored system the solenoid will only close on a lamp failure error On a monitored system the solenoid is closed when the UV level drops below 50 Also not...

Страница 21: ...suffix i e LB5 Z1 3 Australian New Zealand AS NZ 3112 4 suffix i e LB5 Z1 4 Lamp Power Watts 20 standard output lamp 45 high output lamp Power Watts 23 21 230V 57 48 230V Replacement Lamp RL 420 RL 4...

Страница 22: ...OR will not be liable for any costs of removal installation transportation or any other charges which may arise in connection with a warranty claim Products which are sold but not manufactured by LUMI...

Страница 23: ...TO THE EXTENT ALLOWED BY APPLICABLE LAW ANY AND ALL EXPRESS OR IMPLIED WARRANTIES NOT SET FORTH HEREIN ARE WAIVED AND DISCLAIMED INCLUDING ANY IMPLIED WARRANTY OF MERCHANT ABILITY OR FITNESS FOR A PA...

Страница 24: ...luminating technologies for life 80 Southgate Drive Unit 4 Guelph Ontario CANADA N1G 4P5 P 519 837 3800 TF 855 837 3801 F 519 837 3808 info luminoruv com www luminoruv com PN 910114 Version Date 12 20...

Отзывы: