background image

1 2 |

P a g e

System Disinfection

With a new installation, or any time the UV system is shut down for service, without power, or is 

inoperative for any other reason, the lines in the home or facility could be contaminated. Use the 

following steps to fully disinfect the lines throughout the entire home or facility.

Step 1:  Check for and remove any “dead ends” in the lines throughout the home as these can 

harbor bacteria. Plug in the UV system and wait until it is ready for operation.

Step 2:  Remove the filter cartridge from the last sump and fill it with 1-2 cups of household 

bleach (most are 5.25% chlorine). Replace the sump and slowly turn on the water supply.

Step 3:  At a water outlet, run the water until bleach can be smelled. Repeat this for all faucets, 

toilets, shower heads, refrigerators, outdoor taps, the washing machine, dishwasher, etc. at the 

home or facility. Once finished, wait a minimum of 30 minutes before continuing.

Step 4:  Reinstall the filter cartridge into the sump and flush the chlorine solution by opening 

all faucets until chlorine can no longer be detected. Your home has now been completely disin-

fected with your BLACKCOMB UV system ready to inactivate any microorganisms that enter the 

home.

Cleaning the Quartz Sleeve

Depending on the water quality, the quartz sleeve may require periodic cleaning. At a minimum, 

the quartz sleeve should be cleaned on an annual basis. The following steps outline a basic clean-

ing procedure.

Step 1:  If a by-pass assembly is installed, shut the inlet valve off to prevent water flow through 

the system. Otherwise, turn off main water inlet valve (and/or turn off the water pump).

Step 2:  Disconnect power cord of UV system from electrical outlet.

Step 3:  Release water pressure by opening a downstream faucet and then close the outlet 

shut-off valve (if any). If there is no outlet shut-off valve, expect water to drain from the system 

as the head pressure in the system will cause the water to flow back down.

Step 4:  Remove the captive ground screw from the ground lug on the UV reactor.

Step 5:  Remove the lamp connector from the reactor (gland nut) by pushing the LUMI-loc 

connector in and turning it ¼ turn counter-clockwise.  Disconnect the lamp connector from the 

lamp.  CAUTION: the lamp may be hot!

Step 6:  Being careful to touch only the ceramic ends, remove the lamp out of the reactor.

Step 7:  Unscrew the gland nut from the reactor exposing the end of the quartz sleeve.

Step 8:  Remove the quartz sleeve and o-ring by gently twisting and pulling the quartz sleeve.

Step 9:  Using a soft, lint-free cloth or towel wipe the sleeve down using a commercial scale 

cleaner (i.e. CLR® or LIME-A-WAY®). This removes scaling or iron deposits that may be on the 

outside of the quartz sleeve. Be careful not to get any moisture or liquids inside of the sleeve.

Содержание BLACKCOMB LB5-Z12-2

Страница 1: ...tions LUMINOR Rack Mount Systems System Rated Flow Sediment Carbon LB4 Z1 LB5 Z1 8 gpm YES 10 NO LB4 Z2 LB5 Z2 8 gpm YES 20 NO LB4 Z12 LB5 Z12 8 gpm YES 10 YES 20 LBH4 Z2 LBH5 Z2 15 gpm YES 20 NO LBH4...

Страница 2: ...pply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is chemical free p...

Страница 3: ...1 BLACKCOMB6 1 Controllers 14 BLACKCOMB5 1 BLACKCOMB6 1 Power up Sequence 14 BLACKCOMB5 1 Operational Screens 15 BLACKCOMB6 1 Operational Screens 16 Lamp Countdown Sequence 16 System Service Suggested...

Страница 4: ...vice instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or others 8 Your system is int...

Страница 5: ...required will depend on parameters being treated Hardness 7 gpg 120 mg L if hardness level is 7 gpg or slightly below the quartz sleeve must be cleaned periodically in order to ensure effi cient UV p...

Страница 6: ...OMB rack mount UV system is designed as a do it yourself DIY system with a single inlet and outlet port Unpack the system and ensure all the components are included in the box Your system is shipped w...

Страница 7: ...s until the pump stops This is known as the cycle time 4 Then using a container of known volume preferably in US Gallons open the faucet or tap nearest the pressure system and measure the amount of wa...

Страница 8: ...ng plate 4 screws for a single filter model and 8 screws for a double filter model Step 3 Carefully lower the filter head or heads from the rack assembly and rotate 180 de grees Reassemble onto the ra...

Страница 9: ...idue on the sleeve and lamp which can ultimately block the UV light from getting to the water Carefully slide the sleeve into the reactor until you can feel it hit the opposite end of the reactor Alig...

Страница 10: ...the system The most common leak is from the o ring not making a proper seal on the reactor For new installations review steps 6 and 7 For older systems drain the reactor remove the o ring dry it and r...

Страница 11: ...land nut and turn the connector approximately turn to lock the connector to the gland nut as in Figure 10 Figure 9 Lamp Key Installation Figure 10 LUMI Loc Connector Step 14 Tighten the captive ground...

Страница 12: ...y require periodic cleaning At a minimum the quartz sleeve should be cleaned on an annual basis The following steps outline a basic clean ing procedure Step 1 If a by pass assembly is installed shut t...

Страница 13: ...slowly out of the sensor port Step 6 Holding the sensor in your hand wipe the flat portion sensor face of the sensor with isopropyl alcohol using a clean lint free cloth Step 7 Replace sensor followin...

Страница 14: ...ystem s performance in addition to pro viding any applicable fault messages and system diagnostics The controllers used in both the BLACKCOMB5 1 and BLACK COMB6 1 are identical The difference is that...

Страница 15: ...reens by pressing the button located on the front of the controller BLACKCOMB6 1 Operational Screens On systems with the UV monitor the system will display the same screens as on the BLACK COMB5 1 exc...

Страница 16: ...dible chirp Past the zero day threshold the LED or display screen changes to solid red with a continuous buzzer BLACKCOMB6 1 BLACKCOMB5 1 BLACKCOMB4 1 At any point during this sequence the audible chi...

Страница 17: ...stems After the lamp is expired it must be replaced with the same part number as indicated on the Maintenance Parts screen or on the label on the reactor With the system powered down re move and disca...

Страница 18: ...n the reactor or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleeve and sensor Check water quality meets requirements on page 5 and add filtration as required Replace...

Страница 19: ...extreme situations elevated water temperature or the fluctuation in temperature can lower the output of the UV lamp In these cases or if the elevated water temperature is a nuisance LUMINOR recommends...

Страница 20: ...rating is 240VAC 50 60Hz 30VDC 2A On a non monitored system the solenoid will only close on a lamp failure error On a monitored system the solenoid is closed when the UV level drops below 50 Also not...

Страница 21: ...suffix i e LB5 Z1 3 Australian New Zealand AS NZ 3112 4 suffix i e LB5 Z1 4 Lamp Power Watts 20 standard output lamp 45 high output lamp Power Watts 23 21 230V 57 48 230V Replacement Lamp RL 420 RL 4...

Страница 22: ...OR will not be liable for any costs of removal installation transportation or any other charges which may arise in connection with a warranty claim Products which are sold but not manufactured by LUMI...

Страница 23: ...TO THE EXTENT ALLOWED BY APPLICABLE LAW ANY AND ALL EXPRESS OR IMPLIED WARRANTIES NOT SET FORTH HEREIN ARE WAIVED AND DISCLAIMED INCLUDING ANY IMPLIED WARRANTY OF MERCHANT ABILITY OR FITNESS FOR A PA...

Страница 24: ...luminating technologies for life 80 Southgate Drive Unit 4 Guelph Ontario CANADA N1G 4P5 P 519 837 3800 TF 855 837 3801 F 519 837 3808 info luminoruv com www luminoruv com PN 910114 Version Date 12 20...

Отзывы: