
Model 4525 Gate Monitor
Operator’s Manual
Ludlum Measurements, Inc.
Page 20
May 2018
The Main screen should now try to connect to the RPMs. After a few moments,
all the RPMs should have a status of “Connected.”
If any RPMs show timeout errors, double check all communication parameters.
Setup Checklist
Terminate network cables.
Unpack computer equipment and install at location.
Connect RPMs and computers to Ethernet switch.
Set up computer IP Address.
Set up computer names and work group.
Install software on computers.
Set RPM network configuration.
Share Supervisor folder.
Map Supervisor folder on Echo/Data Viewer computers (optional).
Setup Echo and Data Viewer software to use mapped drive letter or UNC
path.
Set up Supervisor to connect to RPMs.
Power-Down Procedure
1.
Close all running programs, including the Supervisor and Data Viewer
applications on each station.
2.
Shut down the computer. Do not power off computer without first
shutting down Windows, or data loss may result!
3.
Turn off each RPM using the power switch inside the control box.
Содержание 4525
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 42: ...Model4525GateMonitor Operator sManual Ludlum Measurements Inc Page 34 May 2018 ...
Страница 43: ...Model4525GateMonitor Operator sManual Ludlum Measurements Inc Page 35 May 2018 ...