Central Site of a Multi-site Configuration
8-8
Issue 1 January 1997
Call
Collection
Interface
See Call Collection Interface in Chapter 3 for protocol details.
Polling
Schedule
The Start and End Times refer to the time-slot in which a site has claim to that
port. If a poll runs over its time-slot, it will end (the remainder of the data will
be down-loaded on the next poll). Once a poll ends, the next site with a claim
to that port will be polled.
1.
CALL COLLECTION - POLLING SCHEDULE WORK-SHEET
plan a complete schedule for the entire group of sites polled through a single port.
2.
At the Polling Schedule dialog box:
a.
To remove a time-slot, select it, use Delete, and proceed to step 3.
b.
To add a new time-slot, choose Add; for changes, select a time-slot and
choose Edit.
i. If you selected to add or
edit a schedule, complete
the resulting dialog box as
set up in your worksheet
(step 1).
ii. Select OK to accept these
entries and return to the
prior dialog box.
Содержание MERLIN LEGEND Reporter
Страница 1: ...MERLIN LEGEND Reporter Installation and Use...
Страница 96: ...PSU at a Polled Site Issue 1 January 1997 7 5...
Страница 121: ...Worksheets Issue 1 January 1997 A 15...