Installation 3 - 13
4. Test BD alarm levels.
5. Test other optional circuit packs.
Step J: Load Turn-up
Turn on and adjust all rectifiers for normal operation according
to the Rectifier manual.
Connect all loads, one at a time, by turning on the load circuit
breakers. If a circuit breaker trips immediately when turned on,
this may be due to inrush current and does not necessarily
indicate a fault condition. Attempt to close the circuit breaker a
second time. If the breaker trips again, check the wiring to the
load circuit and the instructions for powering up that load.
Installation
Procedures For
Plant Growth
As your power needs evolve, equipment may be readily added to
the battery plant to provide any of the following.
•
Expanded controller features
•
Additional rectifier capacity
•
Increased battery capacity
•
Additional load circuits
Procedures for adding controller features, rectifiers and batteries
to an operating plant are described in the installation sections of
the associated subsystem manuals. The procedure to add load
circuits is described below.
Adding a Load
Circuit
The following procedure provides the steps to add a new load
circuit to an operating battery plant.
Warning
Before applying power to any individual load, follow the
powering up instructions as provided in the associated load
equipment documentation.
Warning
Procedures in this paragraph may cause power alarms to be
issued temporarily. Notify the alarm reporting center before
starting any installation procedure on an operating battery
plant.