Lucent Lineage
®
2000 ECS Battery Plant H569-408
3 - 6 Installation
Issue 2 July 1996
Step C: Cable Support and Ground System
Hang all cable support systems, as well as any auxiliary ground
bus bars, as dictated by the job application drawings.
Step D: Controller and LVD Set-up
1. Follow the controller set-up procedure given in the
Controller manual to complete the steps below.
a. Enable/disable equalize charge set-up
b. Enable/disable rectifier restart set-up
c. Set HV shutdown level(s)
d. Set BD alarm level
e. Run office alarm wiring
f.
Run other controller wiring
g. Set up other optional circuit packs
Table 3C: Installation Reference Documents
Step
Procedure
Reference Document
A
Unpacking
This manual “Sequence of
Tasks” Step A
B
Battery Stand
Assembly
Battery Manual (157-622-
010) J85504C-1
C
Cable Support and
Ground System
Job Application Drawings
D
Controller Setup and
LVD Test
Controller Manual
E
AC Wiring Rectifier
Installation and
Rectifier Test
Rectifier Manual
H569-408 Drawing
T-82670-30 Drawing
F
Battery Connections
Battery Manual
G
Load Wiring
H569-408
Drawing
T-82670-30
Drawing
H
Initial Battery Charge
Battery Manual
Rectifier Manual
I
Controller Test
Controller Manual
J
Load Turn Up
Load Equipment
Documentation