4 - 16
⑤
Handling of the 3-point linkage
z
When driving without attached implement, comply with the followings.
1. Fix upper link(5) with the fixing hook.
2. Connect stabilizer(2) to the lower link(3) to avoid the lateral movement of the lower link.
3. Connect lower link strap to both lower links(3) (if fitted, chain type stabilizer only)
z
If 3-point linkage is not necessary, raise 3-point linkage to maximum height and fix it by turning the
down speed control knob, or remove it as follow.
1. Remove upper link pin(8) and upper link(5).
2. Detach rear side of the stabilizer(2) from the lower link(3) while holding lower link tightly not to fall
down.
3. Remove lift rod (LH), lift rod (RH) and stabilizer(2) step by step.
4. Remove lower link(3) carefully not to get hurt due to its weight.
①
④
③
⑤
②
⑥
⑦
①
Lift rod (LH)
②
Stabilizer
③
Lower link
④
Lift rod (RH)
⑤
Upper link
⑥
Lift rod pin
⑦
Upper link pin
Содержание XG3032
Страница 97: ...4 24 Front wheel track 7 14 4PR with rim disk W5x14 Unit mm inch 1115 43 9 in 1207 47 5 in Standard track...
Страница 100: ...4 27 Attaching points for Front end loader z When attaching the front end loader refer to the drawings as below...
Страница 144: ...6 1 6 Dimension and Specification 4WD model Unit mm 1091 1374 1115 3401...