5 - 5
★
First Replacement
●
Replacement
▲
Check, Adjustment and Supply
■
Clean up
No.
Checking Parts
Page No.
Check period (hr)
Daily
50
100
250
300
500
2-yr
1
Fuel tank
5-10
▲
2
Fuel filter
5-25
●
3
Fuel pre-filter
5-7, 5-19, 5-23
★
▲
●
4
Engine oil
5-7, 5-9, 5-20
▲
★
●
5
Engine oil filter
5-7, 5-20
★
●
6
Engine coolant
5-12, 5-26
▲
●
7
Radiator screen
5-13, 5-17
▲
■
8
Air cleaner
5-12, 5-18, 5-23
▲
■
●
9
Battery
5-18
▲
10
Engine belt tension
5-22
▲
●
11
Valve clearance
5-25
▲
12
Nozzle injection
pressure
5-25
▲
13
Hyd. oil filter & HST filter
5-7, 5-21
★
●
14
Transmission oil
5-18, 5-24
▲
●
15
Front axle oil
5-18, 5-24
▲
●
16
Steering cylinder
5-17
▲
17
Front axle holder &
Steering arm
5-17
▲
18
3-Point linkage
5-17
▲
19
HST Pedal
Neutral state
5-16
▲
20
Brake pedal play
5-15
▲
21
Turn signal lights,
Lights, Horn
5-11
▲
22
Instrument panel &
Indicators
5-10
▲
23
Bolts and Nuts
5-14
▲
24
Tire air pressure
5-13
▲
25
Toe-in
5-22
▲
26
Hydraulic hoses
5-18
▲
Содержание XG3032
Страница 97: ...4 24 Front wheel track 7 14 4PR with rim disk W5x14 Unit mm inch 1115 43 9 in 1207 47 5 in Standard track...
Страница 100: ...4 27 Attaching points for Front end loader z When attaching the front end loader refer to the drawings as below...
Страница 144: ...6 1 6 Dimension and Specification 4WD model Unit mm 1091 1374 1115 3401...