
4 - 12
①
Upper link installation and
adjustment
z
Adjust the upper link
①
depending on the
implements.
z
Length of the upper link
①
can be adjusted by
turning the grip
②
.
z
Fasten the lock nut
③
.
z
Adjusting range : 15.7 ~ 29.5 inch.
▶
Insert the snap-pin
⑤
firmly to prevent the upper link pin
④
from being escaped.
Notice
②
Adjustment of the lift rod’s length
z
Lift rod (RH) can be adjusted by loosening the
lock-nut
②
, and turning the body
①
.
z
After adjusting, tighten the lock-nut
②
again.
③
Adjustment of stabilizer’s length
z
The length of the stabilizer can be adjusted by
turning the handle
②
, after removing the fixing-
pin
①
.
z
After adjusting, insert the fixing-pin
①
again.
▶
Adjust the lateral swinging
clearance of the implement to
be within 20~40mm (0.8~1.6 in).
Notice
②
①
④⑤
③
①
②
①
②