Quantity Schedule 

730 Width Towers 

 
Trade King 730

 to EN 1004 

 
Internal / External Use 

Description 

Tower Height (m) 

1.83 

2.83 

4.83 

6.83 

8.83 

Platform Height (m) 

0.90 

1.65 

3.65 

5.65 

7.65 

730E Base Frame Unit c/w Castors 

1 1 1 1 

730E 8 Rung Ladder Frame 

 

 2 4 6 

730E 4 Rung Guardrail Frame 

 

2 2 2 2 

Horizontal Brace 1.55m (

RED

) 2 

5 9 9 13 

Diagonal Brace 1.72m (

BLUE

)  

2 5 9 13 

Trapdoor Platform 

1 2 2 3 

Telescopic Stabiliser   

 

 4 4 4 

Toeboard Set 

 

1 1 1 1 

1.55m Span Tower Total Self-Weight (kgs) 

44.0 

66.3 

130.5 

147.5 

178.0 

 

NUMBER OF WORKING PLATFORMS ALLOWED 

The MAXIMUN SAFE WORKING LOAD (the combined weight of the users, tools and materials) that may be placed on the tower is 
the total weight less the self weight of the tower. The total weight for the towers in the schedule is 

864 kg 

Numbering of working platforms allowed: the maximum load is 864kg this is 3 working platform, if the maximum height is decrease 
the maximum load (self load+230kg x number of working platform) should decrease accordingly.. 
 

Example 1: 

A Trade King 730 tower built with a 7.65m platform height and a platform length of 1.55m has a self weight of 178kg. 

 

864.0kg 

  178.0kg 

 

686 kg maximum safe working load 

Total weight self weight 

(user, tools and materials)

 

 

Example 2: 

A Trade King 730 tower built with a 3.65m platform height and a platform length of 1.55m has a self weight of 130.5kg. 

 

864.0kg 

  130.5kg 

 

733.5 kg maximum safe working load 

Total weight self weight 

(user, tools and materials) 

For greater heights and loads, consult

 

Loyal Scaffolding Limited

 for guidance. 

 
PLATFORMS LOADING

 

 

On an 

Trade King 730

 tower a platform comprise of a single deck only. The maximum safe working load (the combined weight of the 

users, tools and materials) that may be placed on a platform is 230

 

kg, evenly distributed over the deck. 

The quantities above will enable

 Trade King 730 t

owers to be built safely and therefore comply with the requirements of the EN1004. 

They include double guardrails to all platforms, and toeboard

s

 will need to be added if any levels are used as working platform and 

for storage of materials. EN 1004 requires platforms at least every 4.2m, and these measures will exceed that requirement 
 

 

BALLAST : Internal/External use

 

There is no requirement for ballast on 

Trade King 730

 tower if using stabilisers as detailed in the table above

.

 

 

 
 
 
 
 

Содержание Trade King 730

Страница 1: ......

Страница 2: ...to ensure your system is erected easily and safely The law requires that personnel erecting towers must be competent and qualified to do so Any person erecting a Trade King 730 mobile tower should ha...

Страница 3: ...e tie in the tower to a rigid structure when working outdoors or in exposed conditions 16 Beware of the funneling effect of open ended and unclad building 17 Debris netting or plastic sheeting should...

Страница 4: ...th vehicles e g lift trucks Do not lift pull or push the mobile scaffold tower with a lift truck 3 When moving the tower always beware of any live electrical apparatus overhead cables or moving parts...

Страница 5: ...t every 4 metres height 3 For further information on tying in a tower please contract your supplier G MAINTENANCE STORAGE TRANSPORT 1 All components and their parts should be regularly inspected to id...

Страница 6: ...6 14 Trade King 730 Aluminium Scaffold Tower Components List 600...

Страница 7: ...form height and a platform length of 1 55m has a self weight of 178kg 864 0kg 178 0kg 686 kg maximum safe working load Total weight self weight user tools and materials Example 2 A Trade King 730 towe...

Страница 8: ...and 1 0m above platforms Never stand on an unguarded platform positioned above the first rung of a tower If your risk assessment shows it necessary you may also need to guardrail platform at this leve...

Страница 9: ...to erection 3 Inspection tower prior to use 4 Tower upright and level 5 Castors locked and legs correctly adjusted 6 Diagonal braces fitted 7 Stabilisers outriggers fitted as specified 8 Platforms loc...

Страница 10: ...base unit at the base of the tower Step 1 Set up the folded base stand pre assemble Step 3 Fit one horizontal brace RED onto the bottom rung 1st rung Step 4 Fit one diagonal braces BLUE in between the...

Страница 11: ...r to horizontal as possible Step 8 Remove temporary platform from the lowest rung to the 6th rungs Step 9 Fit the temporary guardrails RED on the 8th and 10th rungs in that order on both sides of the...

Страница 12: ...n the 13th and 16th rungs Step 15 Fit another one pair of diagonal braces BLUE in opposite direction between the 17th and 20th rungs Step 16 Remove temporary platform and the guardrails from the lowes...

Страница 13: ...irection between the 21st and 24th rungs Step 21 Fit next one pair of diagonal braces BLUE in opposite direction between the 25th and 28th rungs Step 22 Fit one pair of 4 Rungs guardrail frames and ch...

Страница 14: ...thin the trapdoor You may then unlock the securing hook at the ends of the guardrail to remove them from the tower Note For further information on this product or any other products and services pleas...

Отзывы: