background image

10  /  14 

Step  2.

  Locked  all  the  castor  wheels  (4  Nos.)  and  folded 

hinge 

IMPORTANT 

  Only  use  the  adjustable  on  the 

legs to level the tower and not to gain extra height

 

Assembly Procedure 

ASSEMBLY FOR Trade King 730 MOBILE TOWERS 

Always start building with the folded base unit at the base of the tower. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 1.

 Set up the folded base stand. (pre-assemble) 

Step 3.

 Fit one horizontal brace (

RED

) onto the 

bottom rung (

1st

 rung) 

Step 4. 

Fit one diagonal braces (

BLUE

) in between the 

1st 

and 

4th

 rungs

Step 5.

 Fit one temporary platform on the 

3rd

 rungs and 

locked the securing hook. Fit one pair of 8 Rungs ladder 
frames and check the frame interlock clips are engaged.

Step 6. 

Fit one diagonal braces (

BLUE

) in between the 

5th 

and 

8th

 rungs

LOCK 

Содержание Trade King 730

Страница 1: ......

Страница 2: ...to ensure your system is erected easily and safely The law requires that personnel erecting towers must be competent and qualified to do so Any person erecting a Trade King 730 mobile tower should ha...

Страница 3: ...e tie in the tower to a rigid structure when working outdoors or in exposed conditions 16 Beware of the funneling effect of open ended and unclad building 17 Debris netting or plastic sheeting should...

Страница 4: ...th vehicles e g lift trucks Do not lift pull or push the mobile scaffold tower with a lift truck 3 When moving the tower always beware of any live electrical apparatus overhead cables or moving parts...

Страница 5: ...t every 4 metres height 3 For further information on tying in a tower please contract your supplier G MAINTENANCE STORAGE TRANSPORT 1 All components and their parts should be regularly inspected to id...

Страница 6: ...6 14 Trade King 730 Aluminium Scaffold Tower Components List 600...

Страница 7: ...form height and a platform length of 1 55m has a self weight of 178kg 864 0kg 178 0kg 686 kg maximum safe working load Total weight self weight user tools and materials Example 2 A Trade King 730 towe...

Страница 8: ...and 1 0m above platforms Never stand on an unguarded platform positioned above the first rung of a tower If your risk assessment shows it necessary you may also need to guardrail platform at this leve...

Страница 9: ...to erection 3 Inspection tower prior to use 4 Tower upright and level 5 Castors locked and legs correctly adjusted 6 Diagonal braces fitted 7 Stabilisers outriggers fitted as specified 8 Platforms loc...

Страница 10: ...base unit at the base of the tower Step 1 Set up the folded base stand pre assemble Step 3 Fit one horizontal brace RED onto the bottom rung 1st rung Step 4 Fit one diagonal braces BLUE in between the...

Страница 11: ...r to horizontal as possible Step 8 Remove temporary platform from the lowest rung to the 6th rungs Step 9 Fit the temporary guardrails RED on the 8th and 10th rungs in that order on both sides of the...

Страница 12: ...n the 13th and 16th rungs Step 15 Fit another one pair of diagonal braces BLUE in opposite direction between the 17th and 20th rungs Step 16 Remove temporary platform and the guardrails from the lowes...

Страница 13: ...irection between the 21st and 24th rungs Step 21 Fit next one pair of diagonal braces BLUE in opposite direction between the 25th and 28th rungs Step 22 Fit one pair of 4 Rungs guardrail frames and ch...

Страница 14: ...thin the trapdoor You may then unlock the securing hook at the ends of the guardrail to remove them from the tower Note For further information on this product or any other products and services pleas...

Отзывы: