STABILISERS
To improve rigidity, stabilisers can be used at lower level than shown in the table on
page 7
and fitted as below figure.
Assembly Procedure
Mobile Towers
ASSEMBLY AND DISMAMTLING PROCEDURES
When building a
Trade King 730
Scaffold Tower
All platforms feature double guardrails on both faces of each platform(s).
All guardrails should be 1 and 2 rungs (0.5m and 1.0m) above platforms.
Never stand on an unguarded platform positioned above the first rung of a tower. If your risk assessment shows it necessary,
you may also need to guardrail platform at this level.
Always start building with the folded base unit at the base of the tower.
TO DISMAMTLING A
Trade King 730
Scaffold Tower
Remove toeboards, and pass down the tower.
Unclip farthest end of braces and immediately go to protected trapdoor position to complete removal.
Remove upper platforms from protected levels below.
Pass removed components out of the tower to a colleague.