background image

12  /  14 

Assembly Procedure 

ASSEMBLY FOR Trade King 730 Mobile Tower 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step  13.

  Fit  the  guardrails  (

RED

)  on  the 

16th

  and 

18th

 rungs, in that order, on both sides of the tower. 

Step 14. 

Fit next one pair of diagonal braces (

BLUE

) in 

opposite direction between the 

13th 

and 

16th

 rungs

Step 15. 

Fit another one pair of diagonal braces (

BLUE

in opposite direction between the 

17th 

and 

20th

 rungs

Step 16.

 Remove temporary platform and the guardrails 

from  the  lowest  level  and  placed  on  the 

14th

  rungs 

trapdoor platform 

Step 17. 

Fit another one pair of 8 Rungs ladder frames and 

check the frame interlock clips are engaged. 

Step 18. 

Fit next one trapdoor platform on the 

22nd

 

rungs and locked the securing hook. 

Содержание Trade King 730

Страница 1: ......

Страница 2: ...to ensure your system is erected easily and safely The law requires that personnel erecting towers must be competent and qualified to do so Any person erecting a Trade King 730 mobile tower should ha...

Страница 3: ...e tie in the tower to a rigid structure when working outdoors or in exposed conditions 16 Beware of the funneling effect of open ended and unclad building 17 Debris netting or plastic sheeting should...

Страница 4: ...th vehicles e g lift trucks Do not lift pull or push the mobile scaffold tower with a lift truck 3 When moving the tower always beware of any live electrical apparatus overhead cables or moving parts...

Страница 5: ...t every 4 metres height 3 For further information on tying in a tower please contract your supplier G MAINTENANCE STORAGE TRANSPORT 1 All components and their parts should be regularly inspected to id...

Страница 6: ...6 14 Trade King 730 Aluminium Scaffold Tower Components List 600...

Страница 7: ...form height and a platform length of 1 55m has a self weight of 178kg 864 0kg 178 0kg 686 kg maximum safe working load Total weight self weight user tools and materials Example 2 A Trade King 730 towe...

Страница 8: ...and 1 0m above platforms Never stand on an unguarded platform positioned above the first rung of a tower If your risk assessment shows it necessary you may also need to guardrail platform at this leve...

Страница 9: ...to erection 3 Inspection tower prior to use 4 Tower upright and level 5 Castors locked and legs correctly adjusted 6 Diagonal braces fitted 7 Stabilisers outriggers fitted as specified 8 Platforms loc...

Страница 10: ...base unit at the base of the tower Step 1 Set up the folded base stand pre assemble Step 3 Fit one horizontal brace RED onto the bottom rung 1st rung Step 4 Fit one diagonal braces BLUE in between the...

Страница 11: ...r to horizontal as possible Step 8 Remove temporary platform from the lowest rung to the 6th rungs Step 9 Fit the temporary guardrails RED on the 8th and 10th rungs in that order on both sides of the...

Страница 12: ...n the 13th and 16th rungs Step 15 Fit another one pair of diagonal braces BLUE in opposite direction between the 17th and 20th rungs Step 16 Remove temporary platform and the guardrails from the lowes...

Страница 13: ...irection between the 21st and 24th rungs Step 21 Fit next one pair of diagonal braces BLUE in opposite direction between the 25th and 28th rungs Step 22 Fit one pair of 4 Rungs guardrail frames and ch...

Страница 14: ...thin the trapdoor You may then unlock the securing hook at the ends of the guardrail to remove them from the tower Note For further information on this product or any other products and services pleas...

Отзывы: