![Lorentz PS1200 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/lorentz/ps1200/ps1200_instructions-for-installation-operation-service_1939703006.webp)
6
Installation Report
Installation Date
by
Well Depth
m / ft
Pump depth
m / ft
Additional Vertical Lift (up to top of tank)
m / ft
Static Water Level
m / ft
Drawdown level
m / ft
Drop Pipe (vertical from the pump)
Size
mm
2
/ inch
Type
Length
m / ft
Additional Pipe Length (to tank)
Size
mm
2
/ inch
Type
Length
m / ft
Submersible Pump Cable
Wire size
mm
2
/ AWG
Total Length (controller to pump)
m / ft
MAX RPM CONTROL
(See Section 5.6) Factory setting is Maximum.
If this setting was reduced, enter setting here:
System Report Form continued
yes
no